ISSUE 2016 Rev 1 - Installation Manual
3
RM Cylinders
MAIN PRESSURE HOT WATER STORAGE SYSTEM COMMISSIONING CHECKLIST
*All installations in England and Wales must be notified to Local Authority Building Control (LABC) either directly or through a Competent Persons Scheme.
A Building Regulations Compliance Certificate will then be issued to the customer. ©Heating and Hotwater Industry Council www.centralheating.co.uk
Commissioning Engineer’s Signature
Customer’s Signature
(To confirm satisfactory demonstration and receipt of manufacturer’s literature)
ALL INSTALLATIONS
The hot water system complies with the appropriate Building Regulations
The system has been installed and commissioned in accordance with the manufacturer’s instructions
The system controls have been demonstrated to and understood by the customer
The manufacturer’s literature, including Benchmark Checklist and Service Record, has been explained and left with the customer
Yes
Yes
Yes
Yes
THERMAL STORES ONLY
What store temperature is achievable?
What is the maximum hot water temperature?
o
C
o
C
UNVENTED SYSTEMS ONLY
Where is the pressure reducing valve situated (if fitted)?
What is the pressure reducing valve setting?
Has a combined temperature and pressure relief valve and expansion valve been fitted and discharge tested?
The tundish and discharge pipework have been connected and terminated to Part G of the Building Regulations
Are all energy sources fitted with a cut out device?
Has the expansion vessel or internal air space been checked?
bar
Yes
Yes
Yes
No
Yes
No
No
ALL SYSTEMS
What is the incoming static cold water pressure at the inlet to the system?
Has a strainer been cleaned of installation debris (if fitted)?
Is the installation in a hard water area (above 200ppm)?
If yes, has a water scale reducer been fitted?
What type of scale reducer has been fitted?
What is the hot water thermostat set temperature?
What is the maximum hot water flow rate at set thermostat temperature (measured at high flow outlet)?
Time and temperature controls have been fitted in compliance with Part L of the building Regulations?
Type of control system (if applicable)
Is the cylinder solar(or other renewable compatible)?
What is the hot water temperature at the nearest outlet?
All appropriate pipes have been insulated up to 1 meter or the point where they become concealed
bar
Yes
Yes
Yes
No
No
No
o
C
l/min
Y Plan
S Plan
Yes
Yes
Other
No
o
C
Yes
ALL SYSTEMS PRIMARY SETTINGS
(indirect heating only)
Is the primary circuit a sealed or open vented system?
What is the maximum primary flow temperature?
Sealed
Open
o
C
This Commissioning Checklist is to be completed in full by the competent person who commissioned the storage system as a means of
demonstrating compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference.
Failure to install and commission this equipment to the manufacturer’s instructions may invalidate the warranty but does not affect statutory rights.
Customer Name
Telephone Number
Address
Cylinder Make and Model
Cylinder Serial Number
Commissioned by (print name)
Registered Operative ID Number
Company Name
Telephone Number
Company Address
Commissioning Date
To be completed by the customer on receipt of a Building Regulations Compliance Certificate*:
Building Regulation Notification Number (if applicable)
15