RM Cylinders Intercyl Скачать руководство пользователя страница 16

ISSUE 2016 Rev 1 - Installation Manual 

RM Cylinders 

 

MAIN PRESSURE HOT WATER STORAGE SYSTEM COMMISSIONING CHECKLIST

 

 

 

 

 

 

 

 

 

 

 

 

*All installations in England and Wales must be notified to Local Authority Building Control (LABC) either directly or through a Competent Persons Scheme.    
A Building Regulations Compliance Certificate will then be issued to the customer. ©Heating and Hotwater Industry Council www.centralheating.co.uk 

Commissioning  Engineer’s Signature 

 

Customer’s Signature 

(To confirm satisfactory demonstration and receipt of manufacturer’s literature) 

ALL INSTALLATIONS 

The hot water system complies with the appropriate Building    Regulations 
The system has been installed and commissioned in accordance with the manufacturer’s instructions 
The system controls have been demonstrated to and understood by the  customer 
The manufacturer’s literature, including Benchmark Checklist and Service Record, has been explained and left with the customer 

Yes 

Yes 

Yes 
Yes 

THERMAL STORES ONLY 

What store temperature is achievable? 
What is the maximum hot water  temperature? 

o

o

UNVENTED SYSTEMS ONLY 

Where is the pressure reducing valve situated (if fitted)? 
What is the pressure reducing valve  setting? 
Has a combined temperature and pressure relief valve and expansion valve been fitted and discharge tested?   
The tundish and discharge pipework have been connected and terminated to Part G of the Building Regulations 
Are all energy sources fitted with a cut out   device? 
Has the expansion vessel or internal air space been  checked? 

bar 

Yes 

Yes 

Yes 

No 

Yes 

No 
No 

ALL SYSTEMS 

What is the incoming static cold water pressure at the inlet to the system? 
Has a strainer been cleaned of installation debris (if   fitted)? 
Is the installation in a hard water area (above 200ppm)? 
If yes, has a water scale reducer been  fitted? 
What type of scale reducer has been  fitted? 
What is the hot water thermostat set  temperature? 
What is the maximum hot water flow rate at set thermostat temperature (measured at high flow outlet)? 
Time and temperature controls have been fitted in compliance with Part L of the building Regulations?  
Type of control system (if  applicable) 
Is the cylinder solar(or other renewable compatible)? 
What is the hot water temperature at the nearest   outlet? 
All appropriate pipes have been insulated up to 1 meter or the point where they become concealed 

bar 

Yes 

Yes 

Yes 

No 

No 

No 

o

l/min 

Y Plan 

S Plan 

Yes 

Yes 

Other 

No 

o

Yes 

ALL  SYSTEMS  PRIMARY  SETTINGS  

(indirect heating only) 

Is the primary circuit a sealed or open vented system? 
What is the maximum primary flow  temperature? 

Sealed 

Open 

o

This Commissioning Checklist is to be completed in full by the competent person who commissioned the storage system as a means of 

demonstrating compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference. 

Failure to install and commission this equipment to the manufacturer’s instructions may invalidate the warranty but does not affect statutory rights. 
Customer Name 

Telephone Number   

  

Address 

 

 

Cylinder Make  and Model   

 

  

Cylinder Serial  Number 
Commissioned by (print name) 

Registered Operative ID Number   

  

Company Name 

Telephone Number    

  

Company Address    

 

  

  

    Commissioning  Date    

 

To be completed by the customer on receipt of a Building Regulations Compliance Certificate*: 

Building Regulation Notification Number (if applicable)   

 

 

 

15 

Содержание Intercyl

Страница 1: ...INSTALLATION MANUAL Issue 2016 Rev 1 Tested to BS EN 12897 2006 FOR MORE INFORMATION GO TO WWW RMCYLINDERS COM Note By installing this product you agree to be bound by our Conditions of Sale found wi...

Страница 2: ...2 Product Specifications 3 General Installation and Commissioning 6 Service and Maintenance 9 Fault Finding 10 Benchmark Commissioning Checklist 15 Service Record 16 User Guide and Customer Service 17...

Страница 3: ...ISSUE 2016 Rev 1 Installation Manual 3 RM Cylinders 2...

Страница 4: ...responsibilities on both manufacturers and installers The purpose is to ensure that customers are provided with the correct equipment for their needs that it is installed commissioned and serviced in...

Страница 5: ...a flat base capable of supporting the weight of the cylinder when full The minimum recommended cupboard size is 650mm square Nominal diameter of cylinder is 545mm Areas that are subject to freezing sh...

Страница 6: ...0 15MPa 1 5 bar working pressure and a 20 litres per minute flow rate Where mains inlet pressures Hot Outlet Non Return Valve Pump Temperature and Pressure Relief Valve Secondary Return Boiler Flow B...

Страница 7: ...n order to service the inlet control set Ensure the directional flow arrow on the inlet control set follows the required flow of water See schematic diagram A balanced cold supply is necessary if ther...

Страница 8: ...ld utilise the dual control high limit thermostat as described in Connection to a Boiler section For connection to the lower coil you will require a further two port valve and a single control thermos...

Страница 9: ...700 Specification for the design installation testing and maintenance of services supplying water for domestic use within buildings and their curtilages From the tundish pipework should terminate in a...

Страница 10: ...of water is drained from the unit Open the hot tap closest to the unit and open the draining tap Note Water drained off may be hot SERVICE AND MAINTENANCE Servicing must be carried out annually and s...

Страница 11: ...erating tap outlet Insecure Pipework Increase the number of pipe clips External works to public mains Wait for works to be completed Reduced water flow Debris from water mains Strip cleanorreplace Inl...

Страница 12: ...DING Is water running from the Tundish Is the water being discharged hot Tundish YES NO Do you have pressure YES NO No fault See the flow chart for T P Valve See the flow chart for Inlet Control Group...

Страница 13: ...mperature Pressure Relief Valve YES NO Do you have pressure YES NO No fault with the T P No fault with the T P Replace T P if required Replace T P if required Check temperature setting of the cylinder...

Страница 14: ...st fails replace Dual Stat Test Stat continuity Reset Limit Stat Test Dual Stat continuity Is there power to the Element Thermostat Has the thermostat tripped Does the Immersion Heater work Find corre...

Страница 15: ...RM Cylinders ENERGY CUT OUT FAULT FINDING Is the Cut Out Thermostat working Test Stat continuity Energy Cut Out Thermostat NO YES Reset Limit Stat No fault with the Thermostat If test fails replace Du...

Страница 16: ...incoming static cold water pressure at the inlet to the system Has a strainer been cleaned of installation debris if fitted Is the installation in a hard water area above 200ppm If yes has a water sca...

Страница 17: ...VICE 9 Date Engineer Name Company Name Telephone Number Signature SERVICE 8 Date Engineer Name Company Name Telephone Number Signature SERVICE 7 Date Engineer Name Company Name Telephone Number Signat...

Страница 18: ...uty installations where constant usage and reheating is required titanium immersion heaters must be fitted to comply with the warranty Exclusions 16 The effect of scale build up on the unit or its com...

Страница 19: ...1 Installation Manual 3 RM Cylinders TYPICAL WIRING S PLAN 1 ZONE TYPICAL WIRING Y PLAN COLOUR CODES W WHITE G GREY BL BLUE G Y GREEN YELLOW L LIVE N NEUTRAL C COMMON SL SWITCHED LIVE E EARTH 3 Port M...

Страница 20: ...ISSUE 2016 Rev 1 Installation Manual 3 RM Cylinders TYPICAL WIRING S PLAN 2 ZONE COLOUR CODES W WHITE G GREY BL BLUE G Y GREEN YELLOW L LIVE N NEUTRAL C COMMON SL SWITCHED LIVE E EARTH 19...

Страница 21: ...ll the goods to third parties in the normal course of business In this respect the Buyer shall act in the capacity of the Companies commission agent and the proceeds of such sale 6 6 1 shall be held i...

Страница 22: ...ISSUE 2016 Rev 1 Installation Manual 3 RM Cylinders NOTES 21...

Отзывы: