To adjust the 2nd stage piston clearance, use the following procedure:
1.
Remove the 2nd stage head per
Section 7.3
.
2.
While holding the cylinder firmly in place, rotate crankshaft to ensure piston is at Top Dead
Center (TDC).
3.
Measure the clearance between the piston and the top of the cylinder liner. The
spool/guide cylinder may be threaded in or out to achieve a piston to cylinder clearance of
.012" to .016".
4.
Reinstall the head per
Section 7.3
.
7.10
Clearances & Tolerances
Part
Nominal Dimension
Wear Limit
1
st
Stage Piston to Valve clearance
.011-.015”
Adjustable
2
nd
Stage Piston to Valve clearance
.012-.016”
Adjustable
Bearings
N/A
By inspection for knocking or
rough running.
Connecting Rod, Lower Bore
Ø3.146”
+.001”
Connecting Rod, Upper Bore
Ø0.687”
+.001”
Wrist Pin
Ø0.5000”
-.0005”
1
st
Stage Piston
Ø1.21”
Not a wearing part
1
st
Stage Cylinder
Ø1.251”
+.005”
2
nd
Stage Piston
Ø0.497”
-.003”
2
nd
Stage Cylinder
Ø0.501”
+.003”
Valves
-
Inspect for warping, scratches,
or pitting
Содержание 2PS-H-N2
Страница 36: ...RIX Industries MAN 2PS2B N2 Page 28 FIGURE 1 COMPRESSOR CROSS SECTION FASTENER DETAIL...
Страница 37: ...RIX Industries MAN 2PS2B N2 Page 29 FIGURE 2 COMPRESSOR CROSS SECTION PUMP DETAIL...
Страница 38: ...RIX Industries MAN 2PS2B N2 Page 30 FIGURE 3 1ST STAGE VALVE DETAIL...
Страница 39: ...RIX Industries MAN 2PS2B N2 Page 31 FIGURE 4 2ND STAGE VALVE DETAIL...
Страница 40: ...RIX Industries MAN 2PS2B N2 Page 32 FIGURE 5 EXTERIOR FASTENER DETAIL...
Страница 41: ...RIX Industries MAN 2PS2B N2 Page 33 FIGURE 6 MOTOR AND CONTROL BOX MOUNTING...
Страница 42: ...RIX Industries MAN 2PS2B N2 Page 34 FIGURE 7 SUCTION PLUMBING DETAIL...
Страница 43: ...RIX Industries MAN 2PS2B N2 Page 35 FIGURE 8 INTERSTAGE PLUMBING DETAIL...
Страница 44: ...RIX Industries MAN 2PS2B N2 Page 36 FIGURE 9 FINAL DISCHARGE PLUMBING DETAIL...
Страница 45: ...RIX Industries MAN 2PS2B N2 Page 37 FIGURE 10 COOLING FAN SUB ASSEMBLY DETAIL...
Страница 46: ...RIX Industries MAN 2PS2B N2 Page 38 FIGURE 11 BELT INSTALLATION DETAIL...
Страница 47: ...RIX Industries MAN 2PS2B N2 Page 39 FIGURE 12 GUARD MOUNTING DETAIL...
Страница 48: ...RIX Industries MAN 2PS2B N2 Page 40 FIGURE 13 CONTROL BOX DETAIL 1 OF 2...
Страница 49: ...RIX Industries MAN 2PS2B N2 Page 41 FIGURE 14 CONTROL BOX DETAIL 2 OF 2...
Страница 50: ...RIX Industries MAN 2PS2B N2 Page 42 FIGURE 15 CONTROL BOX WIRING DIAGRAM...
Страница 51: ...RIX Industries MAN 2PS2B N2 Page 43 FIGURE 16 ELECTRICAL SCHEMATIC...
Страница 52: ...RIX Industries MAN 2PS2B N2 Page 44 FIGURE 17 FLOW SCHEMATIC...
Страница 56: ......
Страница 57: ......
Страница 58: ......
Страница 59: ......