background image

Technical Information   SB 13     

09/09

Operating instructions

F u n   Pa k     F   4

Counter-Current and massage equiPment

Содержание Fun Pak F4

Страница 1: ...Technical Information SB 13 09 09 Operating instructions Fun Pak F 4 Counter current and massage equipment...

Страница 2: ...n Pak Rimini Attractions and Functional overview page 9 3 4 Fun Pak Modena 370 Attractions and Functional overview page 10 3 5 Fun Pak Modena 660 Attractions and Functional overview page 11 3 6 Fun Pa...

Страница 3: ...k as a standard feature is delivered completely pre assembled in the pool For this the RivieraPool foundation shaft is required for the corresponding steps If due to lack of space or building reasons...

Страница 4: ...Our foundation shafts are fitted as standard with a shaft drain bonded connector d 50 Exception swimming pools with a shower tray or filtration equipment installed in the equipment shaft are additiona...

Страница 5: ...aerator and humidity switch Set humidity switch to 65 The aerator must also run in winter when the swimming pool is switched off 4 Before doing the classing lay the shaft cover Leave sufficient space...

Страница 6: ...nsert latching lightly into place To operate the jet inserts switch off the pump The power can be regulated by partially turning the jet insert Air can be mixed into the counter current swimming syste...

Страница 7: ...nt system can be switched to the left or right onto the other attractions In this case turn off the massage pumps before moving the jets The counter current jets operate when the jets are in their mid...

Страница 8: ...her attractions In this case turn off the massage pumps before moving the jets The counter current jets operate when the jets are in their middle position turn left hand jet to the left Masterjet mass...

Страница 9: ...ets can be manually switched to 2 Microjet massage jets and a master jet in the seating area a floor geyser in the foot area optional around the seating step and a water torrent in the pool wall Pump...

Страница 10: ...tem can be switched to the left or right onto the other attractions In this case turn off the massage pumps before moving the jets The counter current jets operate when the jets are in their middle po...

Страница 11: ...counter current system can be switched to the left or right onto the other attractions In this case turn off the massage pumps before moving the jets The counter current jets operate when the jets are...

Страница 12: ...e counter current system can be switched to the left or right onto the other attractions In this case turn off the massage pumps before moving the jets The counter current jets operate when the jets a...

Страница 13: ...unter current system can be switched to the left or right onto the other attractions In this case turn off the massage pumps before moving the jets The counter current jets operate when the jets are i...

Страница 14: ...ockwise and withdrawing them from the jet element Loosen the Z bracket of the counter current equipment and remove the jets Plug the overwintering stoppers delivered with the system into the base of t...

Страница 15: ...t opening of the jet bushing Attach the jet closers made from transparent PVC pipe and screw on the locking ring hand tighten While doing this ensure the diverter opening does not move in the process...

Страница 16: ...www pools de One of the leading German manufacturers of prefabricated swimming pools swimming pool technology and whirlpools Member of BSW...

Отзывы: