3-2 Riverstone Networks RS 3000 Switch Router Getting Started Guide
Specifications
Hardware Installation
3.2
SPECIFICATIONS
lists physical, electrical, and environmental specifications for the RS 3000.
3.3
INSTALLING THE HARDWARE
Hardware installation of the RS 3000 is accomplished by the following basic steps:
•
Unpacking your shipment and verifying its contents
•
Installing expansion line cards (if any)
•
Mounting the unit into an equipment rack
•
Connecting the serial and 10/100 Base-T management cables
This section provides detailed information regarding these procedures.
3.3.1
Verifying Your Shipment
Before you begin installing your RS 3000, check your shipment to ensure that everything you ordered arrived securely.
Open the shipping box(es) and verify that you received the following equipment:
•
RS 3000 power cord(s)
•
Console (serial) cable
•
Riverstone Networks RS 3000 Switch Router Getting Started Guide
•
Riverstone Networks Documentation CD
•
Release Notes
•
Rack mount kit
•
Depending on your order, your shipment may also contain line cards
Table 3-1
Physical, electrical, and environmental specifications
Specification
Measurement
Height
2.8 in (7.1 cm)
Width
17 in (43.2 cm)
Depth
18.5 in (47 cm)
Weight
20 lbs (9 Kg)
Power
100-240 VAC, 3-1.5 A, 50-60 Hz
Operating temperature
+0° to 40°C (32° to 104°F)
Non-Operating Temperature
-40° to 70°C (-40° to 158°F)
Operating Humidity
10% to 95% (non-condensing)
Non-operating Humidity
5% to 95% (non-condensing)
Содержание RS 3000
Страница 1: ...36 004 07 Rev 0A RS 3000 Switch Router Getting Started Guide Release 8 0 ...
Страница 16: ...xvi Riverstone Networks RS 3000 Switch Router Getting Started Guide Figure 3 16 10 100BASE TX RJ 45 port 3 15 ...
Страница 20: ...1 2 Riverstone Networks RS 3000 Switch Router Getting Started Guide Related Documentation About This Guide ...