![Riverstone Networks Mojave Edition 041315V Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/riverstone-networks/mojave-edition-041315v/mojave-edition-041315v_assembly-instructions-manual_1466179008.webp)
WWW.RSIWW.COM
6 of 8
H-4
H-3
H-3
H-4
H-9
2.4D
Install H-9 solar panel on H-3 profiles
and secure with S-2D nut.
H-9
S-5D
S-11
S-2D
S-5D
S-11
S-2D
S-5D
S-11
S-2D
S-5D
S-11
S-2D
2.4c
Install 4 S-5A
connectors on to
H-9, 2 at the top
and 2 at the bottom.
Side View From Top
S-2D
S-11
H-3
H-9
S-5D
H-9
S-11
S-2D
H-4
H-3
H-3
H-4
H-5
H-5
H-5
H-5
2.4B
Place H-3 profile on H-4 brackets. Fit H-5 connector underneath and
secure with S-11 bolts, S-5D washers and S-2D nuts as shown.
View from bottom
S-5D
S-11
S-2D
H-4
H-3
H-5
NOTE: VIEWS FROM OUTSIDE.
Connectors
QTY
H-5
4
Solar Panel
QTY
H-9
1
H-3
2
S-2C
4
S-7
4
Connectors
QTY
S-11
8
S-5D
8
S-2D 12
H-4
2
Solar Panel Parts
QTY
H-4
H-4
F-1
F-8
2.4A
Working from outside, fit H-4 brackets ontoT-bolts on F-8 and F-1 profiles.
Secure with S-2C caps.
S-2C
NOTE: VIEWS FROM OUTSIDE.
Bottom View