Riverstone Networks Mojave Edition 041315V Скачать руководство пользователя страница 2

Thank you for choosing the Monticello Greenhouse Program

Thank You for your Purchase

We want to thank you for your purchase of the Monticello Greenhouse.   We appreciate 

your support of our American Made Greenhouses.    
The Monticello is designed for the average homeowner; no special degrees are needed.    

The time to assemble depends on the weather, skills, options, and number of helpers 

you have in the process.   All the pieces are cut to size and should fit snug, BUT if 

something is not working please reach out to our help lines so we can make sure that 

there are no delays in the process.    We are not only employees of Riverstone but 

owners of Monticello Greenhouses and can help you through the process and hopefully 

keep the frustration levels down if a question comes up. 
We would like to take a moment to remind you as the new owner of a Monticello 

Greenhouse a few things to increase the life of your greenhouse.

• Make sure that all your roof vents are closed and tied down with the included 

bungee balls during high winds.   This would be a 25 mph gusting wind and up.   

This will help prevent air getting into the Monticello and causing damage.

• Like with the roof vents, make sure the dual doors stay closed during winds.  The 

doors are spring loaded to stay closed but we also know that the greenhouse can 

get rather hot in the warmer months and doors do get propped open.   Just make 

sure that they get closed.

• In cooler snow prone climates, Cut some 2 x 4 ‘s and put them against the roof 

ridge and the floor to help add support from heavy snow and ice.  This is just a 

precaution but could save a lot of aggravation down the road. 

• It is also a good practice to clean the snow off the roof.    A little snow if fine, but 

several inches only will tempt fate and it is best to be safe than sorry. 

• The polycarbonate panels have channels in them.  These are designed to help 

insulate and in moist environments, like after a rainstorm, you might find water 

droplets in these channels.  It will not cause any harm and will burn itself off when 

the air starts to heat up.

• In some cases where there is a lot of rainfall, like the Pacific North West, we 

recommend using clear silicon caulking between the polycarbonate panels and 

the trim plates before the trim plates are put on.  This is just to assure that the 

Monticello stays as dry as possible.  Just give a call if you need some more help 

with this.
Lastly, we are not perfect.   We know that there are better ways to do things, 

we just need some suggestions from our customer base as to what they are.   

Needless to say we are always open to feedback, good and bad, and we do react 

to feedback.  Please, if there is an option you do not see that you feel would make 

the greenhouse experience better, if there is a different way to explain a set-up 

process, or if there is anything else to help make Monticello better we want to 

hear from you.

Thank you again for your purchase and we hope you have many years of growing in 

your new Monticello Greenhouse.

 

David Schnurman

 

Vice President

Содержание Mojave Edition 041315V

Страница 1: ...ood Drive Rockaway NJ 07866 Customer Service 877 373 3078 Email customerservice rsiww com After Hours Helpline 443 574 4764 Monticello Solar Ventilation System Assembly Instructions MojaveEdition Made...

Страница 2: ...osed In cooler snow prone climates Cut some 2 x 4 s and put them against the roof ridge and the floor to help add support from heavy snow and ice This is just a precaution but could save a lot of aggr...

Страница 3: ...Finish assembling the roof in one session Do not leave the roof unattended until it is completely assembled Place all like parts together in a staging area Prepare for each step according to instruct...

Страница 4: ...2C cap as shown B 2 B 2 1 1E Secure B 2 with three T bolt assemblies and one S 2C cap as shown 1 1F Working from outside repeat steps 3 4B and 3 4E to install B 2 connectors on F 1 profiles 1 1c Plac...

Страница 5: ...al profiles Profiles will fit snugly Working from inside right corner place F 6 profile with mitered end next to corner and angled edge facing up onto corner W 1 panel F 6 profile fits snugly between...

Страница 6: ...an easy installation Wear proper safety gear including work shoes gloves and goggles 2 1A Working from inside install two T bolts into track lock into place Fit H 7 thermostat on T bolts Secure with...

Страница 7: ...ith S 7 bolts and S 2 caps 2 3A H 1 H 1 H 6 2 3B Working from outside insert four T bolt assemblies into slots on H 1 brackets Secure to F 8 and F 1 profiles as shown F 10 F 8 F 1 H 1 H 1 H 2 H 2 H 6...

Страница 8: ...3 H 3 H 4 H 5 H 5 H 5 H 5 2 4B Place H 3 profile on H 4 brackets Fit H 5 connector underneath and secure with S 11 bolts S 5D washers and S 2D nuts as shown View from bottom S 5D S 11 S 2D H 4 H 3 H 5...

Страница 9: ...re over to the thermostat with the wire You will need to cut the positive wire Look at the solar panel connectors to determine the positive wire You will hook the positive wire coming in from the sola...

Страница 10: ...urate wiring using charge controller and battery refer to the wiring diagram provided with the charge controller NOTE VIEW FROM INSIDE H 7 H 8 2 5D Continue the wire over to the fan and attach to the...

Отзывы: