Riverside Hydronics EMX SERIES Скачать руководство пользователя страница 6

EMX, EMXO and EMXGO SERIES WATER BOILERS 

34-503 07/13 

 

 

6

3  CHECKING EQUIPMENT BEFORE YOU INSTALL 

Inspect the unit completely upon receipt from the freight carrier before signing the bill of lading. Inspect the 
appliance and all accompanying parts for signs of impact or mishandling. Verify the total number of pieces shown 
on packing slips with those actually received. Contact the freight carrier immediately if any damage or shortage is 
detected. 

 

4 WARRANTY 

Factory warranty does not cover improper installation or operation.  (See warranty for complete details).  
Warranty exclusions include but are not limited to failure or malfunctions resulting from: 

 

1.  Failures to properly apply, install, operate, or maintain the appliance in accordance to printed instructions. 
2.  Abuse, alteration, accident, fire, flood and the like. 
3.  Sediment or lime buildup, freezing or any other conditions causing inadequate circulation.  
4.  Corrosive or contaminated atmosphere. 

 

5 CODES 

The equipment shall be installed in accordance with those installation regulations in force in the local area where 
the installation is to be made. These shall be carefully followed in all cases. Authorities having jurisdiction shall be 
consulted before installation is made. In the absence of such requirements, the installation shall conform to the 
latest edition of the National Fuel Gas Code, ANSI Z223.1 and with the National Electrical Code, NFPA 70. Where 
required by the authority having jurisdiction, the installation must conform to American Society of Mechanical 
Engineers Safety Code for Controls and Safety Devices for Automatically Fired Boilers, No. (CSD-1). All 
appliances conform to the latest edition of the ASME Boiler and Pressure Vessel Code, Section IV. Where 
required by the authority having jurisdiction, the installation must comply with the Canadian Association Code, 
CAN/CSA-B149.1 and/or B149.2 and/or local codes.  

 

6 LOCATION 

1. 

Locate the unit in a clean and dry area as close as possible to the greatest hot water usage and as 
near to gas,

   oil, steam, boiler water and/or electrical power as practical. 

 

2.  Install the unit on a firm and level foundation. 

 

3.  Locate the foundation on a pitched floor near a suitable drain, or make other provisions to prevent contact to 

areas of the building subject to water damage should the boiler or a water connection leak. The drain must be 
sufficient to contain water in excess of 210°F. 

 

7 INSTALLATION 

WARNING:  Use industry standard safe rigging methods when attempting to lift or move this product. 
Failure to follow these instructions could result in property damage, serious injury or death. One common 
method includes the use of straps and spreader bars, lifting from the water heater base skid assembly. 

 

 

1.  Check the data decal on the boiler. Be sure the electrical, water, oil, or gas supply is adequate for the 

installation. 
 

2.  Carefully remove all shipping supports and bracing. (Float type devices have shipping plugs blocking the 

float). 
 

3.  Install shut-off valves and unions on the inlet and outlet water piping for servicing. Use caution when 

threading pipe nipples into tank connections to prevent cross threading, or over-tightening. Always use a 
back-up wrench on tank nipples when tightening unions, valves, etc. 
 

4.  Insulate hot water and return circulation lines. Insulate cold water supply lines if subject to freezing during 

shutdown periods.  
 

IMPORTANT

Do not use the plumbing connected to the appliance as a ground for welding or any 

other purpose. 

Содержание EMX SERIES

Страница 1: ...ation adjustment alteration service or maintenance can cause property damage personal injury exposure to hazardous materials or loss of life Refer to the information contained in this manual A qualifi...

Страница 2: ...ipment Before You Install 4 Warranty 5 Codes 6 Location 7 Installation 8 Service Clearances 9 Clearances to Combustible Surfaces 10 Electrical 11 Venting 12 Combustion Ventilation Air Opening 13 Vent...

Страница 3: ...neering controls Use NIOSH MSHA approved respirators as required see MSDS Wear long sleeved loose fitting clothing eye protection and gloves FIRST AID MEASURES If any of the irritations listed persist...

Страница 4: ...OR THE PHYSICALLY HANDICAPPED HOSPITALS AND NURSING HOMES ELDER CARE FACILITIES AND REST HOMES ORPHANAGES AND CHILD CARE FACILITIES OTHER INSTALLATIONS WHERE RESPONSE TO CONTACT WITH HOT WATER MAY BE...

Страница 5: ...ATURE AND PRESSURE GAUGES 8 3 HANDHOLE CLEANOUT 3 CONTROL ENCLOSURE 9 FLOAT LWCO Optional 4 GAS INLET 10 BOILER WATER RETURN 5 ASME PRESSURE RELIEF VALVE 11 BOILER WATER OUTLET 6 COMBINATION BOTTOM BL...

Страница 6: ...iances conform to the latest edition of the ASME Boiler and Pressure Vessel Code Section IV Where required by the authority having jurisdiction the installation must comply with the Canadian Associati...

Страница 7: ...ss for service is 18 at sides and rear and 24 in front 10 ELECTRICAL WARNING Turn off all electrical service to the appliance when accessing the controls located inside the control cabinet The cabinet...

Страница 8: ...ING Vent this appliance in accordance with the latest edition of the National Fuel Gas Code and in accordance with the authority having jurisdiction See National Fuel Gas Code for complete requirement...

Страница 9: ...2 each opening specified above should have a minimum free area of 1 square inch per 1 000 Btu h input CONFINED AREA FIGURE 1 Equipment located in confined spaces all air from outdoors CONFINED AREA F...

Страница 10: ...y or death 3 The vent connector must be the same size as the product flue outlet The vent size must be determined by the BTU input of the product s and the vent design The horizontal breeching of a ve...

Страница 11: ...uring and after operation Use care to avoid contact with skin while making adjustments 4 Conduct the following gas train leakage test before start up annual intervals and prior to investigating the ca...

Страница 12: ...03 07 13 12 Record the following information for future use 1 Manifold gas pressure W C 2 Vent pressure W C 3 O2 reading 5 7 4 CO2 reading 8 9 5 CO reading ppm less than 300 ppm 6 NOx reading ppm 7 Ve...

Страница 13: ...1850 3250 6700 125 1020 1650 2950 6000 150 950 1500 2650 5500 175 850 1370 2450 5000 200 800 1280 2280 4600 TABLE 1 Multiplier for Propane 1 57 Multiplier for alternate pressure drops 0 3 W C 0 77 1 0...

Страница 14: ...f the pump The pump is a positive displacement type and pumps a constant volume of oil only a portion of which is used by the nozzle s the remainder being bypassed to the return line During gas operat...

Страница 15: ...equipment operator Table 3 page 17 Since boiler designs vary only some of these listed inspections may be appropriate for your particular model Proper water treatment is critical to prevent corrosion...

Страница 16: ...circuit to stop the burner at the proper point then SHUT DOWN THE BURNER IMMEDIATELY Do not restart until all cross connecting piping is checked for obstructions Also check the float bowl If these ar...

Страница 17: ...INSPECTION REPORT DATE BURNER INSPECTION COMBUSTION ANALYSIS TANK INSPECTION TANK FLUSH CLEANOUT PRV TEST INSPECTION VENT INSPECTION THERMOSTAT INSPECTION GAS TRAIN LEAK TEST Recommended Inspection In...

Страница 18: ...EMX EMXO and EMXGO SERIES WATER BOILERS 34 503 07 13 18 Riverside Hydronics LLC 990 Haltom Road Ft Worth TX 76117 1 800 990 5918 www riversidehydronics com...

Отзывы: