17 MAINTENANCE 

 
 

CARBON MONOXIDE WARNING: An annual or seasonal combustion checkout must be performed by 
a qualified service agency to ensure safe operation. Failure to maintain proper combustion can result 
in injury or death. 

 
 
Periodic inspection and checkout of the burner ignition, control system, and fuel valve operation (for tight 
close-off) to ensure safe and reliable operation of this equipment. Refer to the burner installation instruction 
for recommendations. 
 
A preventive maintenance is recommended to assure a long, trouble-free life of the boiler. Refer to ASME 
Section VII for a comprehensive plan for boiler operation, maintenance and lay-up. 
 
Examine the venting system at least once each year for proper connections, alignment and corrosion. The 
blower inlet will collect dust from the air during operation. Disconnect the power to the heater and clean the 
blower wheel when necessary.  
 
Inspect all parts and make replacements when necessary. Check wiring for loose connections and burned 
wires. 

 
WARNING:  Turn off all electrical service to the appliance when accessing the controls located inside 
the control cabinet. The cabinet contains high voltage wiring and terminals. If the electrical service is 
not turned off and these wires or terminals are touched, a dangerous shock causing personal injury 
or loss of life could occur. Close the control cabinet before restoring electrical service to the 
appliance. 
 

A table of periodic safety inspections is attached to this manual for ease of reference by the building service 
technician or licensed equipment operator (Table 3, page 17). Since boiler designs vary, only some of these 
listed inspections may be appropriate for your particular model. 
 
Proper water treatment is critical to prevent corrosion as well as to reduce scale, both of which will reduce the 
life of the boiler. Hydronic heating systems, steam heating systems and process steam systems all have 
different treatment requirements. The makeup of the water, just as the blowdown, will vary with each 
application. Rely on the recommendation of the water consultant. 

 
CAUTION: Turn off all manual valves and burner electrical switches before removing any part for 
service or cleaning. Do not push relay contacts in manually; accidental opening of main automatic 
valve can result. Ensure there is no pressure on the vessel prior to disassembly of any water carrying 
component to prevent serious injury. 

 

1.  Examine the venting system at least monthly for proper connections, alignment, or the presence of 

corrosion. If corrosion appears, the boiler must not be operated until the corroded vent section(s) is 
replaced. 

 

2.  Oil the blower motor and wipe oil and dust from the burner at regular intervals. The static fan will collect 

dust from the air during operation. Clean the screen and fan blades if necessary. The burner should be 
cleaned each year. Inspect all parts and make replacements when necessary. Check wiring for loose 
connections and burned wires. 

 

3.  Periodic inspections and check-out of the burner ignition system, control system and fuel valve operation 

(for tight close-off) should be made. Refer to the burner installation instructions for inspection 
recommendations. 

 

4.  Inspect operating controls to ensure they are level, especially those containing mercury switches. Make 

sure connecting tubing is not kinked or damaged on remote bulb thermostats. 

 

Содержание EMX SERIES

Страница 1: ...ation adjustment alteration service or maintenance can cause property damage personal injury exposure to hazardous materials or loss of life Refer to the information contained in this manual A qualifi...

Страница 2: ...ipment Before You Install 4 Warranty 5 Codes 6 Location 7 Installation 8 Service Clearances 9 Clearances to Combustible Surfaces 10 Electrical 11 Venting 12 Combustion Ventilation Air Opening 13 Vent...

Страница 3: ...neering controls Use NIOSH MSHA approved respirators as required see MSDS Wear long sleeved loose fitting clothing eye protection and gloves FIRST AID MEASURES If any of the irritations listed persist...

Страница 4: ...OR THE PHYSICALLY HANDICAPPED HOSPITALS AND NURSING HOMES ELDER CARE FACILITIES AND REST HOMES ORPHANAGES AND CHILD CARE FACILITIES OTHER INSTALLATIONS WHERE RESPONSE TO CONTACT WITH HOT WATER MAY BE...

Страница 5: ...ATURE AND PRESSURE GAUGES 8 3 HANDHOLE CLEANOUT 3 CONTROL ENCLOSURE 9 FLOAT LWCO Optional 4 GAS INLET 10 BOILER WATER RETURN 5 ASME PRESSURE RELIEF VALVE 11 BOILER WATER OUTLET 6 COMBINATION BOTTOM BL...

Страница 6: ...iances conform to the latest edition of the ASME Boiler and Pressure Vessel Code Section IV Where required by the authority having jurisdiction the installation must comply with the Canadian Associati...

Страница 7: ...ss for service is 18 at sides and rear and 24 in front 10 ELECTRICAL WARNING Turn off all electrical service to the appliance when accessing the controls located inside the control cabinet The cabinet...

Страница 8: ...ING Vent this appliance in accordance with the latest edition of the National Fuel Gas Code and in accordance with the authority having jurisdiction See National Fuel Gas Code for complete requirement...

Страница 9: ...2 each opening specified above should have a minimum free area of 1 square inch per 1 000 Btu h input CONFINED AREA FIGURE 1 Equipment located in confined spaces all air from outdoors CONFINED AREA F...

Страница 10: ...y or death 3 The vent connector must be the same size as the product flue outlet The vent size must be determined by the BTU input of the product s and the vent design The horizontal breeching of a ve...

Страница 11: ...uring and after operation Use care to avoid contact with skin while making adjustments 4 Conduct the following gas train leakage test before start up annual intervals and prior to investigating the ca...

Страница 12: ...03 07 13 12 Record the following information for future use 1 Manifold gas pressure W C 2 Vent pressure W C 3 O2 reading 5 7 4 CO2 reading 8 9 5 CO reading ppm less than 300 ppm 6 NOx reading ppm 7 Ve...

Страница 13: ...1850 3250 6700 125 1020 1650 2950 6000 150 950 1500 2650 5500 175 850 1370 2450 5000 200 800 1280 2280 4600 TABLE 1 Multiplier for Propane 1 57 Multiplier for alternate pressure drops 0 3 W C 0 77 1 0...

Страница 14: ...f the pump The pump is a positive displacement type and pumps a constant volume of oil only a portion of which is used by the nozzle s the remainder being bypassed to the return line During gas operat...

Страница 15: ...equipment operator Table 3 page 17 Since boiler designs vary only some of these listed inspections may be appropriate for your particular model Proper water treatment is critical to prevent corrosion...

Страница 16: ...circuit to stop the burner at the proper point then SHUT DOWN THE BURNER IMMEDIATELY Do not restart until all cross connecting piping is checked for obstructions Also check the float bowl If these ar...

Страница 17: ...INSPECTION REPORT DATE BURNER INSPECTION COMBUSTION ANALYSIS TANK INSPECTION TANK FLUSH CLEANOUT PRV TEST INSPECTION VENT INSPECTION THERMOSTAT INSPECTION GAS TRAIN LEAK TEST Recommended Inspection In...

Страница 18: ...EMX EMXO and EMXGO SERIES WATER BOILERS 34 503 07 13 18 Riverside Hydronics LLC 990 Haltom Road Ft Worth TX 76117 1 800 990 5918 www riversidehydronics com...

Отзывы: