Page 5 of 7
Windward Bay
Bedroom
Assembly Instructions
Made in Viet Nam
email: [email protected]
FURNITURE
Riverside
ASSEMBLY STEPS :
To prevent possible damage to furniture and personal injury, it is recommended that two people are used
to perform the following steps.
5. Install two All-Thread Bolts (R-B) into each metal plate installed onto the Headboard Posts and into the
metal plates on the Storage Footboard.
6. Carefully position one end of one Bed Rail (R-A) onto the All-thread Bolts on the Headboard and
connect using the Flat Washers (R-E), Spring Washers (R-D), and Hex Nut (R-C). Only partially tighten
the Nuts until the Footboard has been connected. Repeat for other Bed Rail.
7. Position and connect the Storage Footboard (F-A) to the other end of the Bed Rails attaching as in the
previous Steps.
8. Carefully align the Storage Footboard to be 'square' with the Headboard. Using the Open Wrench (R-F)
tighten all Hex Nuts attaching the Side Rails to the Headboard and Storage Footboard. (See Detail E ).
9. Attach the three Support Legs (F-E) to the bottom side of three Wood Support Panels with Blocks (F-F).
The Panel Support Legs must be installed into the 6" x 6" x 1/2" blocks mounted on the bottom side of the
panels. (See Detail F). The Support Panel (F-M) used above the drawer compartment does not have a
support leg.
10. Position and attach the Support Panels to the Bed Rails using the Wood Screws (F-L) and your Phillips
Screwdriver.
The levelers located at the bottom of the Support Legs can be adjusted if necessary to support the panels.
11. Reinstall the Drawers into the Footboard by aligning the metal channels of the guides and push back
into the Footboard.
6 pcs.
3 pcs.
1 pc.