FOUNDATION

 

SMART STORE WOODEN FLOOR 

 

 

• 

The optional Smart store kitset wooden floor is precut and de-
signed to be fitted into the shed after the shed is assembled.

 

 

 

• 

Assemble shed as per  instructions and fit floor last.

 

          (see page 14 for details). 

 

CONCRETE SLAB FOR RAISED BASE PLATE SHED

 

 

To build a raised concrete slab for your shed to sit on, we recom-

mend the following:

 

 

• 

The raised slab size should be 15mm smaller than the base 
size of the shed and at least 30mm above ground line.

 

 

• 

The slab should be 80mm thick in the middle and 100mm 
thick around the edges.

 

 

• 

The slab should be laid on a solid or compacted base.

 

 

• 

Plastic sheeting under slab will prevent moisture coming 
through from underneath

.

 

 

• 

During construction, you may raise the  bottom timber 
plate to allow the wall cladding to protrude 20mm below 
the bottom plate. This will stop water flowing between 
the bottom plate and the concrete floor. 

 

          

See note on page 8.

 

80mm

 

100mm

 

7.5mm

 

20mm

 

Concrete Floor

 

Base Plate

 

Wall Cladding

 

6

 

RAISED BASE PLATE OPTION

 

(For sheds placed on a raised concrete floor)

 

No doubt by now you will have decided what sort of base you are putting down. 

 

Please read the section that applies to your situation.

 

If you choose to pour a concrete base you will need to decide whether you wish to raise the base plate of your shed. 

This allows the cladding to protrude below the surface of the concrete  and ensures a  water tight pad. 

 

See concrete pad specifications below

 

By choosing this option you will need to make the pad to the specification below.

 

Содержание SmartStore SM3025

Страница 1: ...ASSEMBLY INSTRUCTIONS SM3025 BASE SIZE 3 020m x 2 520m...

Страница 2: ...CHECK OUT OUR ASSEMBLY VIDEO...

Страница 3: ...are the minimum requirements for cladding used in Smart store Sheds Wash all surfaces annually using a hose and soft nylon brush Within 2 km of coast wash every 3 months as above After a storm wash th...

Страница 4: ...e 1 980m 4 Side Wall Angle 2 040m 2 Roof 1 350m 12 Door 3 4 Sheet 1 850m 3 Door Sides 1 850m 4 Door Jamb 1 890m 2 Door Brace 1 160m 2 Door Brace 0 915m 2 Double Door Weatherstrip 1 850m 1 Barge 1 352m...

Страница 5: ...TION QTY DIAGRAM Front Back Bottom Plates H4 Green 3 020 m 2 Front Back Top Plate H1 Red 3 020 m 2 Side Wall Bottom Plates H4 Green 2 520 m 2 Side Wall Top Plates H1 Red 2 520 m 2 Ridge Beam 90 x 45 3...

Страница 6: ...EMBLE DOOR QUICK OVERVIEW Door Sheets Padbolt Support Top Plate Back Side Wall Sheets Roof Sheets Top Plate Side Top Plate Front Bottom Plate Front Bottom Plate Side Back Wall Sheets Front Wall Sheets...

Страница 7: ...coming through from underneath During construction you may raise the bottom timber plate to allow the wall cladding to protrude 20mm below the bottom plate This will stop water flowing between the bot...

Страница 8: ...e on the outside Rivet sheets together ensuring ends are flush with each other STEP 2 Position door side flashings and 0 945m top and bottom flashings and assemble door as shown ensuring narrow face o...

Страница 9: ...et to the Top Plate 2 clouts per pan see fig 1 Standard Shed Bottom Plate will protrude be low wall sheet by approximately 10mm Raised base plate shed Wall sheet will protrude below the Bottom Plate b...

Страница 10: ...using two clouts per pan STEP 4 Nail the wall sheets to the Bottom Plate at each end ensuring that each side of the wall sheets overhangs the Bottom Plate by 15mm and that the distance between the Top...

Страница 11: ...nsure that the top of the sheets are flush with the top of the Top Plate and that the sides of the wall sheets overhang the Top Plate by 15mm as shown Nail wall sheets to Top Plate two clouts per pan...

Страница 12: ...2 per join screw the Top and Bottom Plates together in the corners STEP 2 Repeat Step 1 with the second Side Panel ensuring that the Side Panel overlaps the Back Wall Panel STEP 3 Stand up the Front...

Страница 13: ...RIDGE BEAM fig 2 fig 3 15mm JACK STUD RIDGE BEAM TOP PLATE ROOF SHEET STEP 2 Position the first Roof Sheet so that the top of the sheet is at the centre of the Ridge Beam and the side of the sheet ove...

Страница 14: ...eet over hangs the end of the Ridge Beam and the Top Plate by 15mm Ensure the Ridge Beam and the Top Plate are straight Nail screw 4 x corners of the Roof Sheet as shown ensuring the ribs on the Roof...

Страница 15: ...ORROSION AND COULD THEREFORE VOID THE WARRANTY FIT PADBOLT Rivet Padbolt to door and keeper onto Door Jamb as shown 14 YOUR DURATUF SMART STORE SHED IS NOW COMPLETE RELAX FRONT BASE PLATE BACK BASE PL...

Страница 16: ...any consequential loss or damage labour or transport charges This warranty is conditional on Construction installation and maintenance being carried out as specified in the Assembly Instruction Manual...

Отзывы: