background image

 

 

5

 

8

 

SECURE SHED

 

4

 

ASSEMBLE BACK 

PANEL

 

3

 

ASSEMBLE SIDE 

PANELS

 

1

 

LAY FOUNDATION

 

2

 

ASSEMBLE DOOR

 

QUICK OVERVIEW

 

PARTS LOCATION

 

5

 

ASSEMBLE FRONT 

PANEL

 

6

 

ASSEMBLE WALLS

 

7

 

ASSEMBLE ROOF

 

Top Plate Back

 

Side Wall Sheets

 

Barge Flashing

 

Spouting 

 

Roof Sheets 

 

Top Plate Side

 

Top Plate Front

 

Bottom Plate Front

 

Bottom Plate Side

 

Back Wall Sheets

 

 

Front Wall Sheets

 

Door Jambs

 

Front Wall Sheet

 

Door Sheets

 

Door Side Flashing

 

Padbolt Support 

 

Hinge

 

Door Brace

 

Door Top/Bottom 

 

Ridge Flashing

 

Содержание Smart Store SM2010

Страница 1: ...ASSEMBLY INSTRUCTIONS SM2010 BASE SIZE 2 020m x 1 020m...

Страница 2: ......

Страница 3: ...cess needs to be adhered to to qualify for the steel warranty of your Duratuf Smart Store shed Wash all surfaces annually using a hose and soft nylon brush Within 2 km of coast wash every 3 months as...

Страница 4: ...m 2 Front Wall Sheets 1 890m 2 Roof 1 110m 4 Door Sheets Narrow 1 850m 2 Door Sides 1 850m 2 Door Jamb 1 890m 2 Door Brace 1 160m 2 Barge 1 110m 2 Door Top Bottom 0 945m 2 Hardware Pack 1 Touchup Pain...

Страница 5: ...CK 2 TIMBER PACK DESCRIPTION QTY DIAGRAM Front Back Bottom Plates H4 Green 2 020 m 2 Front Back Top Plate H1 Red 2 020 m 2 Side Wall Bottom Plates H4 Green 1 020 m 2 Side Wall Top Plates H1 Red 1 022m...

Страница 6: ...ONT PANEL 6 ASSEMBLE WALLS 7 ASSEMBLE ROOF Top Plate Back Side Wall Sheets Barge Flashing Spouting Roof Sheets Top Plate Side Top Plate Front Bottom Plate Front Bottom Plate Side Back Wall Sheets Fron...

Страница 7: ...ng through from underneath During construction you may raise the bottom timber plate to allow the wall cladding to protrude 20mm below the bottom plate This will stop water flowing between the bottom...

Страница 8: ...assemble door as shown ensuring narrow face of flashing is on the front as per fig 1 STEP 4 On the back of the door place door braces in posi tion as shown in fig 4 Ensure that the top and bottom ends...

Страница 9: ...ivet sheets together on overlaps as shown STEP 3 Nail wall sheets to the Top Plate at each end making sure that the top of the sheets are flush with the top of the Top Plate and the sides of the wall...

Страница 10: ...t the sheets together on overlaps as shown STEP 3 Nail the wall sheets to the Top Plate at each end making sure that the top of the sheets are flush with the top of the Top Plate and that the sides of...

Страница 11: ...EP 4 Place the door on the panel In open position approx 5mm below top of top plate Using two rivets rivet the top and bottom hinges to the Door Jamb Flashing ensuring door closes properly Fit remaini...

Страница 12: ...0mm screws screw Top Plates together in the corner Using 2 x 40mm screws 2 per join screw the Bottom Plates together in the corner STEP 2 Repeat Step 1 with the second Side Panel ensuring that the Sid...

Страница 13: ...up with the outside edge of the back wall cladding as in fig 4 Using 4 x 50mm Clouts predrill and nail the Roof Sheets to the Top Plates through the ribs at each corner ensuring ribs on the Roof Sheet...

Страница 14: ...REMOVE ALL DRILL FILINGS FROM ROOF WALLS AND CHANNELS THOROUGHLY FAILURE TO DO THIS WILL RESULT IN CORROSION AND COULD THEREFORE VOID THE WARRANTY FIT PADBOLT Rivet Padbolt to door and keeper onto Doo...

Страница 15: ......

Страница 16: ...s less than 200g m2 as published by Branz Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase This warranty does not cover the following Fast...

Отзывы: