BEFORE YOU BEGIN THE ASSEMBLY PLEASE NOTE
SOME IMPORTANT POINTS
TOOLS REQUIRED
• Electric / Battery Drill
• 5/16” Hex Drive Screwdriver Bit (for screwing in the Tek Screws)
• 3.5mm Steel Screwdriver Bit
• 10mm Steel Screwdriver Bit
• (If anchoring to a concrete floor) 12mm Concrete Drill Bit And Concrete Drill
• ‘Square Drive’ Screwdriver Bit
• Phillips Drill Bit
• Slotted Drill Bit
• Riveter
• Hammer
• Tape Measure
• Stepladder
• String Line
• Adjustable Spanner
• Spirit Level
• Hand Saw
• Caulking Gun
• Tin Snips (Left & Right Hand)
• Flat file (For The Roller Door Lock slots)
• Pipe Wrench (For Roller Door)
• Circular Saw and Jigsaw (For fitting optional timber floor only)
BEFORE YOU START
• Read all instructions right through so you understand the full process.
• Identify all parts and check quantities against the checklist before starting.
SAFETY FIRST!
• Do not attempt to build your shed in high winds.
• Wear rubber coated gloves -beware of sharp edges on steel cladding and flashings.
• Protect your eyes and ears.
• Use electric power tools with care. Use a Safety Trip Switch.
• It is easier and quicker if this shed is assembled by two people. Some understanding of building is recommended and there are some processes that require
handyman experience.
SELECT YOUR SITE
• Your shed must be level. Achieve this by either levelling the ground or by using blocks.
• If your shed is to be positioned on wet or damp ground, we recommend that your shed is raised up off the ground slightly.
WARRANTY REQUIREMENTS
The following maintenance process needs to be adhered to, to qualify for the steel warranty of your Duratuf Milford shed.
• Wash all surfaces annually using a hose and soft nylon brush.
• Within 2 km of coast – wash every 3 months as above. After a storm, wash the cladding and the gutters as soon as possible to remove any highly corrosive
salt deposits.
• Volcanic Ash Fallout – wash as soon as possible, removing fall-out from roof and gutters.
• Do not allow manures, chemicals or other corrosive materials to have direct contact with cladding.
2