13
KS3 BARGE & SPOUTING
Step 2:
Position Barge Flashing (G102) on End
Walls ensuring the back of the Barge is
flush with the Ridge Cap. Rivet Barge to
End Wall every second Rib as well as two
rivets on the top of the barge into the roof
sheet.
Step 3:
Position Spouting at the front of the shed
ensuring it sits on top of the Barges and
is flush at the ends. Rivet it to the Roof
sheets every second Rib and two Rivets
through each Barge.
Step 1:
Fit Ridge Cap Flashing as shown. When posi-
tioned correctly rivet through rivet Ridge Cap
Flashing to Roof Sheets and back Wall Sheets,
one rivet every second rib.