background image

• 

Drill

 

• 

Drill Bit 3.5mm

 

• 

Drill Bit 6mm (for clear roof panel only)

 

• 

Hex Drive 5/16

 

• 

Riveter (free Duratuf riveter supplied in kit)

 

• 

Hammer

 

• 

Nail Punch

 

• 

Tape Measure

 

• 

Ladder or Saw stool

 

• 

Spanners x 2

 

• 

String Line

 

• 

Tin Snips

 

• 

Skillsaw and Jigsaw (for floor only)

 

• 

Masonry Drill and 10mm Masonry Bit (for Bolt Down Kit only)

 

 

 

• 

Read all instructions carefully.

 

• 

Identify all parts and check quantities against checklist.

 

• 

If you are making your own floor refer to Raised Base Plate section 
now.

 

 

 

• 

Do not attempt to build your shed in high winds.

 

• 

Beware of sharp edges.

 

• 

Protect your eyes and ears.

 

• 

Use electric tools with care. Use a Safety Trip Switch.

 

• 

It is easier and quicker if this shed is erected by two people.

 

 

 

• 

Your shed must be level. Achieve this by either levelling the ground 
or  by using blocks.

 

• 

If you shed is to be positioned on wet or damp ground, we recom-
mend that your shed is raised up off the ground slightly.

 

Tools Required:

 

Select your site:

 

Safety:

 

Before you start:

 

ASSEMBLY INSTRUCTIONS

 

3

 

Содержание Duratuf KIWI KS2

Страница 1: ...Quality Built In ASSEMBLY INSTRUCTIONS KS2 BASE SIZE 2545mm x 876mm...

Страница 2: ...structions Keith s practical tips and tricks will make your assembly experience that much simpler giving you visual guidance through sections that seem tricky on paper and help you achieve a flawless...

Страница 3: ...checklist If you are making your own floor refer to Raised Base Plate section now Do not attempt to build your shed in high winds Beware of sharp edges Protect your eyes and ears Use electric tools wi...

Страница 4: ...0 603m 0 588 x 0 150m 1 Fixed Window Frame Glaze Beads Glass Louvre Window Frame Glass Window Hardware Pack 1 016m Clear Roof Panel Security Single Door Hardware Pack Alarm MA20 Shed light Bolt Down...

Страница 5: ...45 786 876 45 45 45 END WALL 883 1900 or 1870 for Raised Base Plate only 1900 or 1870 for Raised Base Plate only 1 810 YELLOW YELLOW YELLOW YELLOW YELLOW YELLOW YELLOW 45 45 785 2545 45 45 45 FRONT W...

Страница 6: ...il in place Ensure Green joins to Green Step 4 Carefully roll the frame over so that the Ridge Beam and Base Plate Green are off the ground Select two studs Yellow and two 785m Nogs Nail in Studs usin...

Страница 7: ...el Use either crayon or ink to mark steel TERMS EXPLANATION To Tack To Tack on a wall sheet means to use minimum nails hammered partly in to hold Wall Sheets in position Should a Wall Sheet need to be...

Страница 8: ...Pan into the Top Plates and Bottom Plates Nail Wall Sheets to mid wall Nogs one per pan Nail each corner Wall Sheet to Studs using two 30mm Clouts evenly spaced Step 3 End Walls Position wall sheet w...

Страница 9: ...Lay out the two window studs 883mm and Nog 634mm on a flat surface Position Nog and nail in place using 2x 75mm nails at each end Step 6 From the inside of the shed slide Louvre Glass into Louvre Uni...

Страница 10: ...r Jambs Position the Door step Flashing in between the Door Jambs at bottom of doorway nail through top of flashing using three 30mm Clouts Repeat with the Overdoor Flashing 105 Step 4 Fit the two sho...

Страница 11: ...ll a hole in right hand end of track 45mm in from outside edge of Corner Flashing Predrill hole in left hand end of track 45mm from outside of door jamb 60mm for Security door option Screw door stops...

Страница 12: ...lding on unlevel ground it may be necessary to temporarily brace the shed with pieces of timber from the packaging Step 3 Position Roof Sheets They should overhang the back top plate by 20mm Ensure ti...

Страница 13: ...at the front of the roof en suring that the ends are flush with the End of the Barge flashings Rivet spouting onto the Roof at every second Rib Use 2 rivets per end and rivet into Barge Flashing Step...

Страница 14: ...a Floor Board on top of Bottom Plates and Joist and push up against end wall Mark out where Studs are Cut checkouts with Electric Jigsaw so Floor Board will fit around Studs Step 3 Re position Floor...

Страница 15: ...Note See below for security option 15 SECURITY DOOR Optional Step 2 Once door is hung position the Locking Stays so they slide into the Locking Brackets easily Screw Locking Stays to Door Jamb Step 1...

Страница 16: ...lthough it is not essential fitting Damp Proof Course in between the Base Plate and the Floor will give add ed protection against moisture CLEAN UP Remove all swarf drill filings with a soft brush or...

Страница 17: ...e to hear about your Duratuf experience and why you chose us Further to that we would also love to see a picture or a short video of your shed installed and doing its job so that we can share this wit...

Страница 18: ...damage sustained during or after installation NOTE Clean swarf off shed IMMEDIATELY after assembly Do NOT mark cladding with pencil Do NOT allow manures chemicals or other corrosive materials to have...

Отзывы: