
6
2. After installed the hydraulic pump and straighten the frame, take out the "T" shape tube
bar, left and right vertical tube, as shown in the figure, fix the hydraulic lifting frame on the
positive hole, take 1 M6*30 semi-
round hexagon screw and φ6 iron gasket into the
corresponding hole on the left vertical tube, the right vertical tube in the same way, lock the
screw with no. 4 hexagon wrench.
As shown in the figure, the installed lifting frame to the positive column is synchronously
mounted on the frame, the hydraulic lifting frame to the positive hydraulic pump, adjust to
the required hydraulic pump hole position, take the φ25 bolt through the hydraulic pump hole
fixed.
holes, and lock the screws with no. 5 hexagon wrench.