Rittal PDU metered/metered plus/switched/managed
31
EN
– The multi-LED of the connected sensor flashes blue continuously.
Confirm the newly connected sensor on the PDU website.
Alternatively, the newly connected sensor can also be confirmed locally via the display. To do this:
In the
Rittal
main menu, select the "Setup" entry and confirm your entry by pressing the "Return" key.
Select the "Sensor" entry and press the "Return" key to confirm your selection. The menu for entering
your security PIN will appear.
Enter the required security PIN (see section 6.1 "Settings via the display") then confirm the entry "Ac-
knowledge All Devices" by clicking on "Return".
Status change display on the CAN bus LEDs:
– Continuous green LEDs: CAN bus status "OK".
– Continuous red LEDs: CAN bus status faulty.
Status change display on the multi-LED of the PDU:
– Continuous green light: The PDU and all devices connected to the CAN bus have the status "OK".
– Continuous orange light: The PDU or at least one device connected to the CAN bus has the status
"Warning".
– Continuous red light: The PDU or at least one device connected to the CAN bus has the status
"Alarm".
Status change display on the multi-LED of the connected sensor.
– Continuous blue flashing: Communication via the CAN bus.
– Green flashing: When the measured value changes or, at the latest, every 5 seconds.
Further sensors are connected as daisy chain.
If necessary, connect another component (e.g. another sensor type) to the second, free CAN bus
interface of the first component.
Proceed in the same way for further components (up to eight units in total).
7
Mass configuration / initial commissioning
To allow easy and quick commissioning of several PDUs, they can be preconfigured using a special
configuration file. The configuration file copied to a USB data carrier allows several PDUs to be config-
ured in just a few minutes without an operational network connection being required. To edit the file on
a PC, either the PDU serial numbers, or at least one of the two MAC addresses of the PDU network
interfaces, is required. A predefined sample file as well as a description of the procedure can be found
on the PDU product pages at our website.
Note:
Further information concerning the connection and configuration of sensors can be found
in the associated documentation of the accessory part.
Settings of the PDU, Mass configuration / initial commissioning