
SlideAir™ Pneumatic Safety Curtain
Installation/Service/Owner's Manual
Rite‑Hite
®
6 Publication:
AMEN00119 2020-07-06
INSTALLATION
Preparation
Continued
Parts Inventory
1 Remove all assemblies and parts from the shipping
container
2 Arrange parts on the floor using the exploded view as
a guide, see
3 Check to insure all parts are included Call technical
support if you have any questions
Header Assembly
The header assembly includes the aluminum extrusion
structure, rodless cylinder, curtain trolleys, proximity
switch(es) (optional), and air hose The cylinder pulls
the curtain open or closed across the opening when
air is supplied
Curtain
The standard curtain is made of either opaque or
translucent material Standard 8 in (203 mm) pleats allow
the curtain to fold back to a compact profile when
not needed
Vertical Supports (Optional)
The vertical supports are rugged 3 in (76 mm) square
tubing Brackets allow easy assembly of the cylinder
assembly to the vertical supports
Dual vertical supports will be mounted on 8 in (203 mm)
square plates
A single pedestal support (A)
will be mounted on 16 in (406 mm) square plates to
compensate for the hanging load
Junction Box Assembly (Optional)
The Junction box assembly includes a four way air
control valve, and the necessary terminal blocks to easily
incorporate an output signal from the existing machine
controller The four way valve is available as 24 VDC or
110 VAC
Control Box Assembly (Optional)
The control box assembly includes a four way air control
valve, open, close and stop push buttons, and (2) 24 VDC
relays This control box allows the SlideAir to be opened
or closed by momentarily pushing a button, or from a
24 VDC output signal from a machine controller This box
requires use of a 110 VAC air valve