INSTALLATION
Change Orientation
Continued
Interlock Assembly (if equipped)
Receiver Post
Interlock Assembly
Latch Bracket
Left to Right Pull
Right to Left Pull
L
K
I
J
L
J
K
I
Back Side
to flip zinc plate (I) end over
end and swap/relocate interlock actuator (J) and flat
screws (K) Reverse order to refasten
NOTE:
• Circuit board (L) is centered and does not get moved
•
DO NOT
overtighten nylock nuts Actuator should have
freedom of movement
•
Nylock nuts (provided with actuator) finish flush with the
screw end (M)
1
9
7
4
5
6
10 11
12
Shown: Back Side (Left to Right pull)
M
2
Flush
8
M
Side View
Bottom View
ORDER
#
QTY DESCRIPTION
1st
(2 places)
1
1
SHROUD,SW,INTRLCK,10MM,DKGRDN
2
2
SCR,RHMS,PHLP,#8-32X1,ZNC
3
2
NUT,HEX,SERRATED,#8-32X1/8",Z
2nd
4
1
PCB,ACTUATOR,DOK-GUARDIAN
5
2
STANDOFF,NYLON,PCB,ADHSV,1/4"
3rd
6
1
ACTR,12VDC,10MM,5MM/S,45N
7
1
LVR,LINKAGE,INTRLCK,DKGRDN
8
2
SCR,RHMS,PHLP,#8-32X3/4,ZNC
9
1
SHAFT, INTRLCK, STOP, 10MM, DKGRDN
4th
10 1
PLATE,INTRLCK,MNT,10MM,DKGRDN
11 4
WSHR,LOCK,SPLIT,#10,ZNC
12 4
SCR,RHMS,PHLP,#10-24X1/2,ZNC
5th
13 2
SCR,FHMS,SCKT,5/16-18X1
Figure 3
Figure 4
Dok‑Guardian™ LD Safety Barrier
Installation/Service/Owner's Manual
Rite‑Hite
®
6 Publication:
AMEN00150 2019-11-13