![RioOutdoors 6F-DH Скачать руководство пользователя страница 26](http://html.mh-extra.com/html/riooutdoors/6f-dh/6f-dh_installation-instructions-manual_1463572026.webp)
26 |
P a g e
10.
Drive one 3/8” x 3” lag screw using a 9/16” socket and ratchet through the header and into the post through the pilot
holes you drilled. Tighten all screws.
1.
Repeat steps 9-10 for all 7/16” holes in all decorated faces in the four dual header brackets at all four post tops.
TWO SCREWS ON
THIS SIDE ALSO