14 |
P a g e
1.9
POSTS INSTALLATION
1.
Slide a 4x4 post inside the open vertical tube in all four corners’ 2-way elbow bracket.
2.
Identify the 5/16” holes in the inner faces of the 2-way elbow’s vertical tube. Drill 3/32” X 1-1/4” pilot holes in the center of
all four 5/16” holes.
3.
Drive one 1/4x1-1/4” SS lag screw through each pilot hole you drilled and tighten down using a ratchet and 7/16” socket.
Repeat steps 1 to 3 at all corners. Check top of floor 4x4 for level on more time and adjust as necessary to maintain level.