
28 |
P a g e
1.12
POST TOP #4C1L BRACKET INSTALLATION
1.
Slide a #4C1L bracket’s tube on the 4x4 post tops #5 & 6 after aligning the header receiver u-channels in the proper
direction. Let gravity work and pull the bracket all the way down on top of the post. If you feel resistance tap lightly on
top of the elbow bracket until it slides all the way down.
2.
Identify the four 5/16” holes which are on two sides of square tube.