Rion GH40 Скачать руководство пользователя страница 5

3

Prepare a Foundation for Your Greenhouse

Before assembling your new Greenhouse a proper foundation must be prepared. A number of anchoring 

options are possible, based on wind and ground conditions in your area. Make sure that you have checked with 

your local authorities regarding any required building permits.
Decide at this time the final orientation of your Greenhouse. We recommend that you place your greenhouse 

in a spot where it will receive direct sunlight and will be protected from the wind as much as possible. The door 

should not face prevailing winds. It is important to clear your Greenhouse of snow in the winter.

Modular Base (Option)

If you have purchased the optional Greenhouse Modular Base follow the assembly instructions in the 

packaging. The Greenhouse Modular Base can be placed in an excavated hole or on the ground.  In either case 

you will require sufficient gravel, earth or other suitable material to fill the base (see table below). All required 

hardware is included.

Treated Wood Base

Build a framework composed of 4 

×

 6 (

) and 2 

×

 12 (

) treated 

lumber using deck screws or galvanized lag bolts and fill it with 

gravel or earth or other suitable material to fill the base up to the top 
surface of the 4 

×

 6 (

). Attach the greenhouse frame through the 

connectors using screws that are 6 mm (

B

") in diameter and no less 

than 70 mm (2

C

") long (not supplied).

Concrete Foundation

Prepare a poured concrete foundation according to local 

building codes. Do not excavate and pour concrete in frozen 

ground. Make sure that there is a slight slope for drainage.
Pour your foundation according to the size of the greenhouse 

model you have selected. Make sure that the foundation is at 

least 10 cm (4") larger than the size of the greenhouse. The 

Greenhouse is secured to the concrete foundation using 

screws and concrete anchors or expansion anchors (not supplied). Use screws 6 mm (

B

") in diameter and no 

less than 70 mm (2

C

") long. A drill with an appropriate masonry bit is required.

Note: 

You may assemble the greenhouse on its base on a hard surface and move it to its final position when 

you have finished. Make sure that there are no obstructions between the assembly area and the final position.

Other Foundation Options

Wood Deck

Your Greenhouse can be secured to a wood deck with screws (not supplied) through the frame connectors. Use 

screws that are 6 mm (

B

”) in diameter and no less than 70 mm (2

C

“) long. Make sure that the wood deck 

itself is securely anchored to the ground. See hardware quantities and foundation measurements above.

Excavated Trench

Your Greenhouse can be placed in an excavated trench to anchor it to the ground. See the foundation 

measurements above for dimensions.

Model

Base Width

 Base Length

Fill Quantity

Screw/Lagbolts

GH44

2.65 meter (8’ 8

J

”) 2.65 meter

 

(8’ 8

J

”)

0.68 cubic meters

 (24 cubic feet)

20

GH46

2.65 meter (8’ 8

J

”) 3.90 meter

 (12’ 9L”)

1.02 cubic meters

 (36 cubic feet)

28

GH48

2.65 meter (8’ 8

J

”) 5.14 meter

 (16’ 10E”)

1.36 cubic meters

 (48 cubic feet)

36

Model

Modules

Foundation Width

 Foundation Length

Screw/anchor set or expansion anchor

GH44

GH40A++GH40B

2.70 meter (8’ 10”)  2.70 meter (8’ 10”)

20

GH46

GH40A++GH40B

2.70 meter (8’ 10”)  3.95 meter (12’ 11”) 28

GH48

GH40A++GH40B

2.70 meter (8’ 10”)  5.20 meter (17’)

36

Содержание GH40

Страница 1: ...son Group International Headquarters North American Distributor Rion Ltd Cabri 25120 O Israel Tel 972 4 995 2666 Fax 972 4 995 2677 email rion rion com homepage http www rion com Systems Trading Corpo...

Страница 2: ...2006 Rion Ltd...

Страница 3: ...spot where it will receive direct sunlight and will be protected from the wind as much as possible The door should not face prevailing winds When your Greenhouse is fully assembled examine it for sha...

Страница 4: ...connections require pins on both sides Note Extra pins are included If you wish to disassemble the parts at any time remove the pins using the pin tool Place the end into the exposed hole and lever t...

Страница 5: ...ground Make sure that there is a slight slope for drainage Pour your foundation according to the size of the greenhouse model you have selected Make sure that the foundation is at least 10 cm 4 larger...

Страница 6: ...4 GH40 Greenhouse Assembly Instructions Identify Greenhouse Parts Because of the Greenhouse modularity you may purchase additional GH40M modules to fit your needs...

Страница 7: ...dditional modules the instructions are indicated in the text Part Code GH44 GH46 GH48 Description 01 4 4 4 Corner Frame Connector 2D 11 15 19 Frame Connector 15 1 1 1 Doorway Frame Connector 3A 2 2 2...

Страница 8: ...L PN2 4 8 12 Lower Roof Panel 60 5 66 7 cm 1 11N 2 2B PN2A 4 4 4 Lower Roof Panel side 61 7 66 7 cm 2 J 2 2B PN5L 2 2 2 Side Panel Left 58 1 44 9 cm 1 10G 1 5M PN5R 2 2 2 Side Panel Right 58 1 44 9 cm...

Страница 9: ...zing Seal roll RA1 4 6 8 RA Glazing Element 57 3 cm 1 10L RB4 6 10 14 RB Glazing Element 84 8 cm 2 9E RB6 4 4 4 RB Glazing Element 80 cm 2 7A RB1 10 14 18 RB Glazing Element 52 cm 1 8A RC5 10 14 18 RC...

Страница 10: ...into the two B2 frame profiles that will be used for the doorway Place the two prepared B2 frame profiles on either side of the 15 connector Place a 2D connector on both sides Place the other parts of...

Страница 11: ...tion Concrete Foundation Mark the foundation through each connector using a scribe or screw Carefully move the frame and then drill holes using an appropriate masonry bit Insert concrete anchors or ex...

Страница 12: ...ile remains in place Slide the assembled PN8R PN8L pediment panel into the open space of the pediment Complete the front pediment with the 7A connector and the R8 profile taking advantage of the flexi...

Страница 13: ...of a 10 connector one in the upper section and the other in the lower section They will overlap inside the connector and their ends will be flush with the far end Slide two E2 profiles over the GSC10...

Страница 14: ...extend beyond the outside channel of the E2 profile so it won t interfere with the placement of the RB1 glazing element page 13 Repeat the previous two steps for the 5A connector on the other side of...

Страница 15: ...n along the length of the profile Place RB1 RB4 and RB6 glazing elements along the arches where shown Place one end of the RB elements in the channels of the profiles and slide them down the length of...

Страница 16: ...the RD1 glazing element Continue until they are fully inserted Remove the ID strips from the panels Assemble the two WINH31 handles to each WIN33 Roof Vent using the included pins Insert the Roof Ven...

Отзывы: