
10
GH40 Greenhouse Assembly Instructions
Assemble the Roof Pediments
Put ST7 couplers on the PN8R and PN8L pediment panel halves as shown. The tops of each coupler are
trimmed to match the angle of the panel.
Note:
The outside surface of the panels have special UV protection, indicated by the logo and the plastic
identification strip. Remove plastic ID strips when as panels are locked in place.
Slide the two pediment panel halves together.
Assemble all parts of the front pediment except for the 7A connector and the R8 profile. Take care that the
internal metal strengthening bar in the E12 profile remains in place.
Slide the assembled PN8R/PN8L pediment panel into the open space of the pediment.
Complete the front pediment with the 7A connector and the R8 profile, taking advantage of the flexibility of
the profiles.
Lock the pediment in place using pins and remove the ID strips from the panels.
Complete Doorway Pediment
Attach the E4R and R2 profiles to the lower right pediment. The E4R profile has a sticker indicating the up
direction.
Slide the PN5R panel
in place. Make sure
that the plastic ID
strip faces out.
Connect the 4A and
09 connectors to an
E2 profile and put it
in place taking
advantage of the
flexibility of the
profiles.
Lock the panel with
pins.
Assemble the lower
left pediment in the
same way. Note the
“UP” sticker on the
E4R profile.
Remove the ID strips
from the panels.
Содержание GH40
Страница 2: ...2006 Rion Ltd...