Rion GH40 Скачать руководство пользователя страница 12

10

GH40 Greenhouse Assembly Instructions

Assemble the Roof Pediments

Put ST7 couplers on the PN8R and PN8L pediment panel halves as shown. The tops of each coupler are 

trimmed to match the angle of the panel.

Note: 

The outside surface of the panels have special UV protection, indicated by the logo and the plastic 

identification strip. Remove plastic ID strips when as panels are locked in place.

Slide the two pediment panel halves together.

Assemble all parts of the front pediment except for the 7A connector and the R8 profile. Take care that the 

internal metal strengthening bar in the E12 profile remains in place.

Slide the assembled PN8R/PN8L pediment panel into the open space of the pediment.

Complete the front pediment with the 7A connector and the R8 profile, taking advantage of the flexibility of 

the profiles.

Lock the pediment in place using pins and remove the ID strips from the panels.

Complete Doorway Pediment

Attach the E4R and R2 profiles to the lower right pediment. The E4R profile has a sticker indicating the up 

direction.

Slide the PN5R panel 

in place. Make sure 

that the plastic ID 

strip faces out.

Connect the 4A and 

09 connectors to an 

E2 profile and put it 

in place taking 

advantage of the 

flexibility of the 

profiles.

Lock the panel with 

pins.

Assemble the lower 

left pediment in the 

same way. Note the 

“UP” sticker on the 

E4R profile.

Remove the ID strips 

from the panels.

Содержание GH40

Страница 1: ...son Group International Headquarters North American Distributor Rion Ltd Cabri 25120 O Israel Tel 972 4 995 2666 Fax 972 4 995 2677 email rion rion com homepage http www rion com Systems Trading Corpo...

Страница 2: ...2006 Rion Ltd...

Страница 3: ...spot where it will receive direct sunlight and will be protected from the wind as much as possible The door should not face prevailing winds When your Greenhouse is fully assembled examine it for sha...

Страница 4: ...connections require pins on both sides Note Extra pins are included If you wish to disassemble the parts at any time remove the pins using the pin tool Place the end into the exposed hole and lever t...

Страница 5: ...ground Make sure that there is a slight slope for drainage Pour your foundation according to the size of the greenhouse model you have selected Make sure that the foundation is at least 10 cm 4 larger...

Страница 6: ...4 GH40 Greenhouse Assembly Instructions Identify Greenhouse Parts Because of the Greenhouse modularity you may purchase additional GH40M modules to fit your needs...

Страница 7: ...dditional modules the instructions are indicated in the text Part Code GH44 GH46 GH48 Description 01 4 4 4 Corner Frame Connector 2D 11 15 19 Frame Connector 15 1 1 1 Doorway Frame Connector 3A 2 2 2...

Страница 8: ...L PN2 4 8 12 Lower Roof Panel 60 5 66 7 cm 1 11N 2 2B PN2A 4 4 4 Lower Roof Panel side 61 7 66 7 cm 2 J 2 2B PN5L 2 2 2 Side Panel Left 58 1 44 9 cm 1 10G 1 5M PN5R 2 2 2 Side Panel Right 58 1 44 9 cm...

Страница 9: ...zing Seal roll RA1 4 6 8 RA Glazing Element 57 3 cm 1 10L RB4 6 10 14 RB Glazing Element 84 8 cm 2 9E RB6 4 4 4 RB Glazing Element 80 cm 2 7A RB1 10 14 18 RB Glazing Element 52 cm 1 8A RC5 10 14 18 RC...

Страница 10: ...into the two B2 frame profiles that will be used for the doorway Place the two prepared B2 frame profiles on either side of the 15 connector Place a 2D connector on both sides Place the other parts of...

Страница 11: ...tion Concrete Foundation Mark the foundation through each connector using a scribe or screw Carefully move the frame and then drill holes using an appropriate masonry bit Insert concrete anchors or ex...

Страница 12: ...ile remains in place Slide the assembled PN8R PN8L pediment panel into the open space of the pediment Complete the front pediment with the 7A connector and the R8 profile taking advantage of the flexi...

Страница 13: ...of a 10 connector one in the upper section and the other in the lower section They will overlap inside the connector and their ends will be flush with the far end Slide two E2 profiles over the GSC10...

Страница 14: ...extend beyond the outside channel of the E2 profile so it won t interfere with the placement of the RB1 glazing element page 13 Repeat the previous two steps for the 5A connector on the other side of...

Страница 15: ...n along the length of the profile Place RB1 RB4 and RB6 glazing elements along the arches where shown Place one end of the RB elements in the channels of the profiles and slide them down the length of...

Страница 16: ...the RD1 glazing element Continue until they are fully inserted Remove the ID strips from the panels Assemble the two WINH31 handles to each WIN33 Roof Vent using the included pins Insert the Roof Ven...

Отзывы: