17
Cover the Walls
Put the R1 round profiles in place.
Add the E1 oval profiles until the frame is
completed.
Insert two pins in each column to lock
them in place. Do not insert pins in the
inner (panel) channels of the column
profiles.
Make sure that the plastic ID strip of a PN1
panel faces out, and put it in place by
gently curving it so that it enters the side
channels of the columns.
Lower the panel towards the frame and slide it into the channel of the base.
Continue with this procedure until all of the PN1 panels on the side of the greenhouse and the PN1 panels
for the front and back of the greenhouse are finished.
Lock the base in place with pins and remove the ID strips from the panels.
PN1
PN1
PN1
PN1
PN1
PN1
PN1
PN1
PN1
PN1
Содержание Eco Grow 6x6'
Страница 1: ...ASSEMBLY INSTRUCTIONS Eco Grow 6x6 6x8 Eco Grow 74499_EN...
Страница 23: ...21 Seal the Door GF GF GF GF DSN DSN DSN DSN DSN GF A A B B GF...
Страница 24: ...22 Hang The Door 4016 7279 425 7217 pin1 pin1 pin1 7224 7224 466 4016 425 7279 466 1 2 3 4 4 2 1 3...
Страница 25: ...23 Holding The Door Open Attach Door Holder 7281 7273 pin1 1 2...