Infinity REU-V2626W / HD200E REU-V2632WC
- 16 -
Issue 1 -
10/10/03
©Rinnai
Hot Water Operation
1. Ignition
• Activate controllers (if fitted) and open the hot water tap (for full details regarding operation of
controllers refer to the ‘How To Use Your Water Heater’ booklet).
• When water flows through the unit, the water flow sensor rotates and sends an electrical ‘pulse’ signal
to the Printed Circuit Board (PCB). This signal is proportional to the water flow rate.
• The PCB sends electrical current to the combustion fan motor causing it to turn. The fan motor sends
an electrical pulse signal to the PCB. If fan rotation is OK, the main solenoid and changeover solenoid
valves open as required, the spark generator activates and the spark electrode ignites the burner.
2. Water Temperature / Flow Control / Volume Control
• The PCB will automatically control operation of the internal components to achieve the programmed
temperature. When a high temperature rise is required, the PCB may cause the Water Flow Servo to
close partially resulting in a lower flow rate to achieve the programmed temperature. This is a
necessary operational feature of the unit.
• When operating in ‘Bath Fill’ mode, the signal from the water flow sensor is also used by the PCB to
compute the volume of water that has been passed through the unit at any instant whilst the bath is
filling.
3. Shut Down
• When operating in ‘Bath Fill’ mode, the PCB causes the Water Flow Servo to close when the
programmed Bath Fill volume has passed through the unit. Alternatively, flow is stopped when the
user closes the hot water tap.
• When water flow stops, the water flow sensor stops rotating and the pulse signal to the PCB stops. The
PCB then causes the main solenoid and solenoid valves to close and the burner is extinguished. The
combustion fan will continue to operate for some time to purge the combustion chamber.
Содержание HD200E REU-V2632WC
Страница 13: ...Infinity REU V2626W HD200E REU V2632WC 8 Issue 1 10 10 03 Rinnai 4 Dimensions...
Страница 18: ...Infinity REU V2626W HD200E REU V2632WC 13 Issue 1 10 10 03 Rinnai 6 Cutaway Diagram...
Страница 19: ...Infinity REU V2626W HD200E REU V2632WC 14 Issue 1 10 10 03 Rinnai 7 Operational Flow Chart...
Страница 20: ...Infinity REU V2626W HD200E REU V2632WC 15 Issue 1 10 10 03 Rinnai 8 Operation Principles REU V2626W REU V2632WC...
Страница 25: ...Infinity REU V2626W HD200E REU V2632WC 20 Issue 1 10 10 03 Rinnai 11 Wiring Diagram REU V2626W...
Страница 26: ...Infinity REU V2626W HD200E REU V2632WC 21 Issue 1 10 10 03 Rinnai REU V2632WC...
Страница 44: ...Infinity REU V2626W HD200E REU V2632WC 39 Issue 1 10 10 03 Rinnai Change Gas Type Switch on PCB...
Страница 56: ...Infinity REU V2626W HD200E REU V2632WC 51 Issue 1 10 10 03 Rinnai 20 Exploded Diagram...
Страница 57: ...Infinity REU V2626W HD200E REU V2632WC 52 Issue 1 10 10 03 Rinnai...
Страница 58: ...Infinity REU V2626W HD200E REU V2632WC 53 Issue 1 10 10 03 Rinnai...
Страница 59: ...Infinity REU V2626W HD200E REU V2632WC 54 Issue 1 10 10 03 Rinnai...
Страница 67: ...Infinity REU V2626W HD200E REU V2632WC Issue 1 10 10 03 Rinnai Notes...
Страница 68: ......