
Rinnai 17
HW_GI_FM10 OIM
COMMISSIONING CHECK LIST
A commissioning check list is provided on the appliance front cover to enable the installer to step through the
correct commissioning procedure when installing a Rinnai water heater.
The check list can also assist the installer to identify potential installation errors that may prevent the appliance
from operating correctly.
INSTALLATION RECORD
The Installation Record is a reference for the end user, help line staff and service technicians. Ensuring that this
information is available here will be helpful in the event that a service enquiry is required.
Installer Details
Installation Company Name:
Address:
Telephone / Mobile Phone:
/
Email:
Certificate of Compliance / Certification No.:
Authorised Persons - Licence No.:
Installers Name:
Installers Signature:
Installation Date:
System Details
Water Heater - Model Number *:
Water Heater - Serial Number *:
* This information will need to be copied from the data plate, located on the left hand side of appliance.
Installation Address:
COMMISSIONING
Содержание FM10LA
Страница 1: ...Gas Instantaneous Water Heater Operation Installation Manual Models FM10NA FM10LA...
Страница 10: ...Rinnai 10 HW_GI_FM10 OIM This page is intentionally blank...
Страница 21: ...Rinnai 21 HW_GI_FM10 OIM NOTES...
Страница 22: ...Rinnai 22 HW_GI_FM10 OIM NOTES...
Страница 23: ...Rinnai 23 HW_GI_FM10 OIM...