![Rinnai Demand Duo Скачать руководство пользователя страница 36](http://html.mh-extra.com/html/rinnai/demand-duo/demand-duo_users-installation-and-operation-manual_1462491036.webp)
36
Rinnai Commercial Hybrid System Installation and Operation Manual
Commercial Hybrid
Single Unit Circulation
Note:
Installation must conform to applicable code
and all requirements listed in the installation
manual. Balancing valves, equivalent piping,
pressure gauges, and temperature gauges are
to be used as necessary to ensure proper flow
between units.
Condensate piping shall be CPVC or PVC
material and shall not be smaller than the
drain connection on the appliance.
Components of condensate drainage shall be
CPVC or PVC material. All components shall
be selected for the pressure and temperature
rating of the installation.
Where the drain pipes from more than one
unit are manifolded together for condensate
drainage, the pipe or tubing shall be sized in
accordance with an approved method as
dictated by local codes.
Condensate must be disposed of
according to local codes.
Building Hot Water Supply Line
Condensate Drain Line
Pipe T&P to Open Drain
Building
Circulation
Pump
Gas Supply
Building Hot Water
Return Line
(Optional)
Cold Water Supply
Tank
T&P
Tankless
PRV
Piping Diagram for Basic Installations
Содержание Demand Duo
Страница 51: ...Rinnai Commercial Hybrid System Installation and Operation Manual 51 Notes ...
Страница 52: ...100000571 00 4 2018 ...