
Page 11 of 49
2. TRACKS
Assemble the track system with the provided nuts & bolts. It is important to assemble and level the
track on a firm foundation before tightening all of the nuts and bolts. It is ideal to assemble the tracks
on a solid and level footing that is a minimum of 4” (100mm) off of the ground. This will allow for easy
cleanup of sawdust from under the tracks and height adjustment of the log supports.
The width of the track should be assembled so that it is 31
.0” (800mm) -35.0” (900mm) wide when
measuring the width from the outside to outside of the “L” rails.
Содержание RS26G
Страница 11: ...Page 19 of 49 Front explosion diagram Rear explosion diagram...
Страница 35: ...Page 43 of 49 DIAGRAM...
Страница 36: ...Page 44 of 49 DIAGRAM...
Страница 37: ...Page 45 of 49 DIAGRAM...
Страница 38: ...Page 46 of 49 DIAGRAM...
Страница 39: ...Page 47 of 49 NOTES...
Страница 40: ......