25
5−6.How to finish operation
When finish this operation, turn off power switch of this unit and turn off the main power (DC24V).
WARNING
・
When finish this operation, do it after making point skip with the upper system
(Centralized system).
・
When finish this operation, check the external output and function of outer equipment to be
connected with external alarm contact. Then, judge whether power can be shut off or not.
When alarm relay contact is energized(option), it is activated when make power (DC24V) off.