background image

 

 15

         

2. There are 7 items. 

         

3. 7/7 Press the 

 switch on the MANUAL CAL screen to save the setting value 

 

Cylinder setting

 

1. Set the cylinder number to be supplied to each sensor. Cylinder settings are stored for each sensor combination   

and for each GX-3R / GX-3R Pro (up to 10). 

2. The setting value when there is one solenoid valve is 3 types of OFF / GAS1 / CHG1 

3. Set value when there are 2 solenoid valves: 4 types of OFF / GAS1 / GAS2 / CHG2 

4. Set value when there are 3 solenoid valves: 5 types of OFF / GAS1 / GAS2 / GAS3 / CHG3 

5 By default, when the GX-3R / GX-3R Pro is set to the domestic specification, CH4 • O2 • CO is assigned to   

GAS1, H2S to GAS2, and others to GAS3 when the GX-3R / GX-3R Pro is a domestic specification. 

For overseas specifications, CH4 

 O2 

 CO 

 H2S is assigned to GAS1, and others to GAS2 and GAS3. 

If the suction port of GAS2 or GAS3 does not exist according to the number of solenoid valves, it is assigned to 

CHG 

Even after connecting the GX-3R / GX-3R Pro with different domestic and overseas specifications, use the 

saved settings. 

6. If set to OFF, do not execute processing. In the case of H2 of CO-H2 sensor, it will be hidden on the screen other   

than the cylinder setting. 

7. CHG 

 is used for gas exchange and processing when the number of cylinders is insufficient. 

  Basic, OFF / CHG 

 is not set. 

8 In the case of GX-3R Pro, set in the order of CH4 

 O2 

 H2S 

 CO 

 fifth component (when set). 

In the case of GX-3R, set in the order of CH4 

 O2 

 H2S 

 CO. 

 

 

 

 

 

 

9 If there is a CO2 sensor with N2 calibration, the next to the 5th component is the setting of N2. N2 can not be set   

after CO2 (number greater than CO2 cylinder setting). 

 

 

 

 

 

 

10. When the 

 switch is pressed on the last gas setting screen, save processing of the set value is executed.   

(Process similar to BUMP setting) 

 

CH4 

%LEL  CO 

ppm  H2S 

ppm 

GAS1 

   

   

O2 

vol% 

CO2 

ppm 

   

   

CYLINDER 

 

CH4  %LEL  O2 

G1 

CO 

ppm  H2S 

ppm 

   

CYLINDER 

 

N2 

 

GAS2 

   

CYLINDER 

 

Содержание PT0-167

Страница 1: ...672 Docking Station SDM 3R Operating Manual PT0 167 2 7 6 Azusawa Itabashi ku Tokyo 174 8744 Japan Phone 81 3 3966 1113 Fax 81 3 3558 9110 E mail intdept rikenkeiki co jp Web site http www rikenkeiki...

Страница 2: ...Pro 5 6 SM operation procedure 7 7 Bump test and gas calibration of SM operation 8 8 Alarm check of SM operation 11 9 Change the setting value of SM operation 12 10 Copy SM operation to USB memory 17...

Страница 3: ...on SM simultaneous execution of up to 10 units DM 4 Copy the result data of bump test gas calibration alarm check to USB memory SM 5 Download data logger data of GX 3R GX 3R Pro with PC DM 6 Charge th...

Страница 4: ......

Страница 5: ...WER switch for 3 seconds to turn off the SDM 3R 2 Power OFF operation is effective only when not in communication with GX 3R GX 3R Pro 5 3 Power on the GX 3R GX 3R Pro 1 When the SDM 3R cover is close...

Страница 6: ...heck The previous result display is only when the GX 3R GX 3R Pro of the same serial number is connected The result is cleared when the power of SDM 3R is turned off so the previous result is not disp...

Страница 7: ...ation 4 While the basic screen or result screen is displayed when the battery level of GX 3R GX 3R Pro is near the low battery error CHARGING is displayed on the charging screen and charging starts 5...

Страница 8: ...ere is an O2 sensor and it is less than 40 seconds after connecting with GX 3R GX 3R Pro extend AIR suction up to 40 seconds 3 Perform bump test gas calibration in the order set by the cylinder settin...

Страница 9: ...y CH4 LEL O2 49 12 0 CO ppm H2S ppm 50 19 5 BUMP CH4 LEL O2 P P CO ppm H2S ppm P F BUMP CH4 LEL CO ppm H2S ppm 50 50 19 5 O2 vol CO2 ppm 12 2 2000 BUMP CH4 LEL CO ppm H2S ppm P P F O2 vol CO2 ppm P P...

Страница 10: ...one bump test gas calibration is completed the result is displayed Record the result in the internal memory 7 Automatic gas calibration after failure of bump test Perform this when AUTO CAL is set to...

Страница 11: ...When ALARM CHECK is ON in BUMP setting or CAL setting alarm check starts after bump test or gas calibration 3 The middle LED blinks orange during alarm check 4 When the alarm check is completed the re...

Страница 12: ...BUMP 9 types AIR FLUSH TIME air time 15 180 seconds Default 15seconds GAS TIME gas aspiration time 20 120 seconds Default 25 seconds AIR PURGE TIME purge time 5 180 seconds Default 15 seconds TOLERANC...

Страница 13: ...hen AUTO EXEC is ON gas calibration starts automatically when the detector is connected When MANUAL CAL is OFF gas calibration is not performed even if the CAL switch is pressed In addition BUMP setti...

Страница 14: ...displays the current item number in the upper right 7 9 9 When the switch is pressed on the AUTO EXEC bump automatic execution screen save processing of the set value is executed 8 During the storage...

Страница 15: ...GAS3 does not exist according to the number of solenoid valves it is assigned to CHG Even after connecting the GX 3R GX 3R Pro with different domestic and overseas specifications use the saved setting...

Страница 16: ...you want to change and press the EDIT ENTER switch 3 In case of ON OFF setting change with switch and press EDIT ENTER switch to confirm 4 Save the set value display DECISION and return to the menu sc...

Страница 17: ...y the saved data When the COPY switch is pressed in the following state the SDM 3R USB device is initialized During initials the COPY LED lights in orange If you do not recognize even if you plug in t...

Страница 18: ...3 05 10 49 33 Result Time3 2018 03 05 10 50 03 Result Time4 2018 03 05 10 49 33 Gas calibration Model GX 3R Serial No Station ID User ID SDM Model SDM 3R SDM Serial No SDM 3R_20171227 Date Time 2018 0...

Страница 19: ...ng press the COPY switch to download the data logger 2 While downloading the data logger DOWNLOAD is displayed on the GX 3R GX 3R Pro LCD and the COPY LED blinks in orange When downloading is complete...

Страница 20: ...green when communication starts 7 Download of device information from GX 3R GX 3R Pro to SDM 3R starts 8 During downloading the BUMP and CAL LEDs of SDM 3R blink in orange 9 When downloading is comple...

Страница 21: ......

Страница 22: ...failure in BUMP red red Low flow rate CAL ON after failure during BUMP green B green B Communication error CAL ON after failure in CAL red red Low flow rate after failure CAL ON during CAL green B gr...

Страница 23: ......

Страница 24: ......

Страница 25: ...25 Revision or Abolition History Edition Revision Issue date 0 First issue 2019 3 15 1 Correct 7 8 and 9 2 Declaration of Conformity added 2019 7 29 2 Declaration of Conformity 2020 4 1...

Страница 26: ......

Отзывы: