background image

 

 

13

 

6.MAINTENANCE 

 
Gas detection and alarm instrument is kept in continuous operation over a long time and must     
perform a vital role as a safety device.    For this purpose, periodical inspection must be made.   
The High-pressure Gas Safety Act in Japan sets forth the obligation of periodical inspection of 
the gas detection and alarm instrument.   
 

- Maintenance Contract – 

Be  sure  to  perform  the  regular  maintenance  since  this  is  an  instrument  for  security  and 
safety.    If this detector head founds defective, contact RIKEN KEIKI    immediately. 

 
6-1.Maintenance intervals and items 

The  maintenance  includes  a  daily  maintenance  which  a  person  in  charge  of  control  and 
operation of the gas detection instrument performs maintenance before work once a day, and a 
monthly maintenance carried out once a month, and periodical maintenance conducted by the 
service  personnel  designated  by  manufacturer.  The  maintenance  items  are  confirmation  of 
lights, concentration indication and alarm function on the indicator/alarm unit side. It is also 
necessary to carry out gas calibration at least every 6 months. The law in Japan sets forth that 
the unit must issue an alarm during the circuit maintenance related to alarm while providing 
normal operation, at least, once a month. 
To maintain the safety operation of the gas detection instrument, it is recommended to keep 
the maintenance contract with our authorized distributor for regular maintenance, adjustment 
and overhaul etc including the gas sensitivity adjustment (gas calibration). 
For the detail of maintenance contract, contact RIKEN KEIKI. 
 

 

 

・This is a safety instrument and the maintenance every 6 months or more 

is mandatory to ensure the safety.    If the unit is used by continuously 

without  maintenance,  the  sensor  sensitivity  may  change,  resulting  in 

failure of correct detection. 

 

 

 

 

 

 

 

 

 

 

 

 

WARNING 

                                    * NOTE 

・Be sure to inform sections concerned beforehand when performing alarm test or 

gas calibration.    For the equipment connected with output signal from 
indicator/alarm unit, perform them after disconnecting the output signal. 

・Special trained engineer for gas detection instrument can perform maintenance 

work accurately and efficiently. 

・Then, it is recommended to contact RIKEN KEIKI for maintenance. 

Содержание GD-F4A-SC-A

Страница 1: ...Oxygen Gas Detector Head GD F4A SC A Operating Manual PT2 152 PT2E 2510...

Страница 2: ...tector head 2 Alarm level for gas alarm instrument shall be set within the performance of the instrument Our standard alarm level is 18 by volume for the prevention of oxygen deficiency 3 This is not...

Страница 3: ...up 12 How to start the detector head 12 How to exit 12 MAINTENANCE Maintenance intervals and items 13 Calibration Required kit and tools for calibration 14 Performing a zero adjustment 14 Performing...

Страница 4: ...or alarm unit to show oxygen content Read the operating manual for indicator alarm unit as well as this manual This unit is designed as drip proof construction for outdoor installation Also it can be...

Страница 5: ...nterval Do not change or remodel the circuit structure of this unit Do not disassemble the sensor since there is a electrolyte inside If your finger touches the electrolyte wash your finger away with...

Страница 6: ......

Страница 7: ...l strip 2 Relayed terminal for input output signal use to the signal converter 4mA adjusting hole VR hole to adjust 4 mA of 4 20mA output factory set SPAN adjusting hole VR hole to adjust SPAN ZERO ad...

Страница 8: ...rformance division and group Performance division ia Group C 3 Relations between allowable inductance Lo and allowable capacitance Co of intrinsic safety circuit and external wiring inductance Lw and...

Страница 9: ...inside detector head Detector head Indicator alarm unit Non hazardous area Non hazardous area CVVS 1 25mm2 2 core or equivalent MAX 2km 4 20mA Signal converter Sensor lead wire Terminal 4 20mA Cable...

Страница 10: ...e to get direct rays of the sun Places closed to high temperature and or emission of electromagnetic wave Place with vibration or shocks Place where the mounting part is weak and it is easy to come ou...

Страница 11: ......

Страница 12: ...ator alarm unit and be specified that it is for power interruption of indicator alarm unit Ground the zener barrier separately corresponding to the A class grounding with ground resistance of 10 or le...

Страница 13: ...se 8 O D 1t copper pipe and so on for piping Carry out piping works as straight as possible Excessively high load may cause burden on the suction pump shortening the effective life of the pump When be...

Страница 14: ...en the pump cannot be used If the sample gas pressure would fluctuate use the constant flow rate control valve to keep the constant flow rate Exhaust the sampled gas to open air in principle When make...

Страница 15: ...the gas flow be sampled to this unit by turning on the pump switch etc Adjust the flowrate to lead sampled gas to 1 0L 0 3mL min Be sure to perform gas calibration at the time of new installation Corr...

Страница 16: ...is also necessary to carry out gas calibration at least every 6 months The law in Japan sets forth that the unit must issue an alarm during the circuit maintenance related to alarm while providing no...

Страница 17: ...bration and confirm that the oxygen reading returns to 20 9vol Return disconnected piping to where they were completion of zero adjustment Performing a span adjustment Plug the ammeter to terminal no...

Страница 18: ...gen sensor has an enough life span However the actual life is depending on the operating conditions Then replace the sensor once a year as the tentative deadline for the replacement cycle NOTE Output...

Страница 19: ......

Страница 20: ...temperature 5 10 Environment of low oxygen content Put a sensor into the container and seal off the container List of recommendable spare parts for regular replacement No Name of parts Inspection fre...

Страница 21: ...head is relocated select a new place in accordance with 4 2 Precautions for installation points and 4 4 How to install For information on wiring work see 4 5 Caution at wiring construction The unpowe...

Страница 22: ...r authorized agent or RIKEN KEIKI Before it is thought to be a trouble Check the wirings around the related instruments as well as this detector head It may be caused by improper operation Re check th...

Страница 23: ...barrier MTL7728ac MTL7728 MTL7728 ZB 1A ZB 1A ZB 1A ZB 4A ZB 4A ZB 4A Cabling port Cable gland Applicable cable O D 8 11mm Piping port Rc1 8 with half union for O D 8 1 Operating temperature 10 40 non...

Страница 24: ......

Страница 25: ...r Safety retainer for explosion protection by limiting the energy of electric current within a non ignition level CVVS This is a kind of connecting cable between indicator alarm unit and oxygen detect...

Страница 26: ...Manual Log Rev Amendment Issue data 0 First issue 2018 2 9...

Отзывы: