14
6. OPERATION - RIKATRONIC3
Note
For
stoves
with
RIKATRONIC3
System
(electronic
air flap control) a flue pipe with optional “lockable
damper flap” must be always open during heating!
RISK OF FIRE!
Each combustion process needs oxygen. Before ignition the
combustion chamber must be regularly cleaned from ash to ensure
an adequate supply of air.
The right fill amount for heating up is 2 - 3 logs of the quantity given
in AMOUNT OF FUEL.
Correct heating up primarily according to instructions counteracts
excessive smoke during heating up.
RIKA firelighter
Always ignite the RIKA firelighter on the red tip. One block consists
out of 8 ribs which can be divided to the desired size. The amount
of RIKA firelighters also depends on the size and humidity of your
firewood. Ideally, one rib is enough to light up the fire.
Tip
You can order the RIKA firelighter with the number E15834 at your
RIKA dealer.
Heating instructions
Preparation
Plug in the mains plug and activate the main switch at the rear of
the stove. The main switch now
lights up
green
. The display at the
front of the stove also
lights up
green
for approx. 10 secs. and
then
flashes intermittently
red
until the air flap motor reference run has
been completed.
Correct heating up
When the display
is constantly
red
, open the combustion chamber
door and sweep the ashes into the ashtray. Place left and right 2 small
pieces of chipboard lengthways in the bottom of the combustion
chamber and open the riddle grate completely.
Place 2 – 3 smaller (highly flammable) logs crossways on top of this
chipboard.
Now place further pieces of chipboard in crossways layers on top of
the logs and ideally you should place 2-4 ribs of the RIKA-firelighter
on top of the chipboard. Some uncoated paper can be placed
underneath the chipboard in case there is no firelighter available.
Now light the firelighter (or the uncoated paper) and close the
combustion chamber door.
As soon as the combustion chamber temperature exceeds 80°C,
the display changes to
green
(if the display does not change to
green
within
10 min of closing the combustion chamber door, then
the heating up procedure has failed, i.e. the required combustion
chamber temperature of 80°C was not exceeded).
Once the display has changed to
green
, the burn-off control of
the heating-up starts. The heating-up phase takes approx. 60 min
depending on the temperature and fill amount. This time is required
to obtain a suitable bed of embers.
The display changing from
green
to
red
flashing
indicates the right
time to add wood.
Содержание LOOK RIKATRONIC 3
Страница 1: ...Operating manual LOOK RLU LOOK RIKATRONIC3...
Страница 5: ...5 EN 4 42 43 41 51 50 53 52 46 49 47 45 48 44 55 54...
Страница 22: ...Notes...