![RightAngle NewHeights Electric Height Adjustable Workstation Скачать руководство пользователя страница 3](http://html1.mh-extra.com/html/rightangle/newheights-electric-height-adjustable-workstation/newheights-electric-height-adjustable-workstation_assembly-instructions_1460737003.webp)
(SEE EXCEPTION IN STEP 7)
LOCATING THE CROSS SUPPORT
DETAIL C
STEPS 7 & 8
BOTTOM OF
WORKSURFACE
SUPPORT
4.00
D
15
LEFT HAND
CENTER
COLUMN
STEP 11
COLUMN
4
CROSS SUPPORTS NOT SHOWN
IN STEPS 11 AND 12 SO OTHER
COMPONENTS ARE VISIBLE
14
COLUMN
HS
M1
M2
M3
RIGHT HAND
WIRING DIAGRAM
WORKSTATIONS WITH
U-CHANNELS GET ONLY
THIS WIRE MANAGTEMENT J
LEFT COLUMN WIRE
STEP 12 WIRE RUNS
HAND SWITCH WIRE
RIGHT COLUMN WIRE
HAND SWITCH WIRE
RIGHT COLUMN WIRE
CENTER COLUMN WIRE
PAGE 3 OF 4
STEP 7:
LEVEL THE CROSS SUPPORT
9
SO IT IS 4" FROM THE BOTTOM OF THE WORKSURFACE SUPPORT. SEE
DETAIL A. FULLY TIGHTEN ALL THE SOCKET SCREWS
11
. USE THE HEX HEAD DRIVER BIT OR THE ALLEN WRENCH
16
PROVIDED.
SPECIAL EXCEPTION: FOR WORKSTATIONS ON WHICH THE LifeBalance™ STATION IS BEING INSTALLED,
THE CROSS SUPPORTS SHOULD BE ATTACHED RESTING ON THE FEET OF THE COLUMN ASSEMBLIES TO ALLOW FOR
CLEARANCE OF THE EQUIPMENT.
INSERT AN END CAP
12
INTO EACH END OF THE CROSS SUPPORT.
STEP 8:
REPEAT
STEPS 4, 6, AND 7
WITH THE RIGHT HAND COLUMN ASSEMBLY
7
AND THE OTHER CROSS SUPPORT
9
.
STEP 9:
ATTACH THE WORKSURFACE SUPPORTS TO THE WORKSURFACE(S) USING (22) WOOD SCREWS
4
. DO NOT
OVER-TIGHTEN THE SCREWS. USE A LOW TORQUE SETTING ON THE DRILL.
STEP 10:
ALIGN THE HOLES IN THE HAND SWITCH
13
AND THE CONTROLLER
14
WITH THE PILOT HOLES IN THE
WORKSURFACE(S)
1
. ATTACH THEM TO THE WORKSURFACE(S) WITH (4) WOOD SCREWS
4
.
STEP 11:
FOR WORKSTATIONS WITH WIRE MANAGEMENT J'S
15
, ATTACH THEM IN THE LOCATIONS SHOWN BELOW
WITH (1) WOOD SCREW
4
IN EACH WIRE MANAGEMENT J. NO PILOT HOLES ARE PROVIDED FOR THESE.
STEP 12:
RUN THE WIRES AS SHOWN BELOW AND PLUG THEM INTO THE RECEPTACLES ON THE CONTROLLER
14
AS SHOWN BELOW. IF YOUR WORKSTATION HAS U-CHANNEL(S), RUN THE WIRES THROUGH THEM.
STEP 13:
WITH THE HELP OF AN ASSISTANT, SET THE WORKSTATION UPRIGHT IN ITS FINAL LOCATION. LEVEL THE WORK-
STATION IF REQUIRED BY TURNING THE LEVELING GLIDES CLOCKWISE (FROM THE TOP) ON THE LOW CORNERS OF
THE UNIT. IF YOUR WORKSTATATION HAS CASTERS, TURN THE BOLTS AT THE TOP OF THE CASTERS CLOCKWISE TO
LEVEL THE UNIT.
6703 ZINSER ST., SCHOFIELD, WI 54476
PHONE: 800.298.4351 FAX: 866.882.9475
www.raproducts.com
VERSION DATED: 10/8/12
K&A MANUFACTURING
14
STEPS 9 & 10
4
WORKSURFACE
SUPPO0RT
SWITCH
HAND
7
13
4
GLIDE OR
CASTER
LEVELING
4