background image

26

INSTALLER

 

INSTALLER

3.9 

Condensate evacuation

TAU N

  condensing  boilers  produce  a  flow  of  condensate  that 

varies according to operating conditions. The maximum hourly 

production of condensate is shown in the technical specifica-

tions table for each individual model.

The condensate outlet must be sized according to this value and 

at no point must the diameter be less than the diameter of the 

boiler condensate discharge (7).

In order to avoid the release of combustion products in the ther-

mal room, it is necessary to insert the trap supplied with the 

boiler in the condensation drain path. The connecting pipes be-

tween the boiler, siphon and waste water drain pit must be laid 

at a minimum down slope of 3° and must be installed in such a 

way as to prevent any build-up of.

The siphon is equipped with a tapping point (G 1/8") which a 

pipe can be connected to, to equalise the pressure between the 

siphon and the exhaust flue.

 

9

Check and clean the condensation drain line on a yearly ba-

sis.

 

9

The connection to the waste water drain pit must be made 

in compliance with national and local legislation and 

standards.

Pressure 

measurement 

fitting

Connection

pipe

Inspection

cap

BOILER

SIPHON

0

-50

+0

0

7

Hose

clamp

 

9

Before commissioning, fill the siphon with water up to level 

“L” in line with the top fitting.

H

2

O

L

3.10 

Neutralising the condensate

TYPE N3 NEUTRALISATION KIT

The TYPE N3 neutralisation units were designed for systems 

equipped with the central heating plant condensate outlet trap 

located lower than the boiler condensate outlet. This neutrali-

sation unit does not require electric connections.

Type

N3

Maximum flow rate of neutralised con-

densation (litres/hour)

180

Dimension (mm)

640x400x240

Q.ty of granulate

50 kg

Fitting Ø

1" 1/2

A

B

C

The inlet fitting (A) of the N2 neutralisation unit (the lower fit-

ting) must be connected to the boiler condensate drain fitting 

using the flexible hose (C) supplied. This condensate drain hose 

is specially made to prevent combustion fumes escaping into 

the atmosphere.

The outlet fitting (B) of the neutralisation unit (the top fitting) 

must be connected to the boiler room’s waste water drain pit 

using another section of flexible hose (not supplied).

 

9

The boiler room’s condensate drain pit must be located at 

a lower level than the fitting (B) on the neutralisation unit.

 

9

The connection pipes used must be as short and straight as 

possible and corrosion-resistant. Any curves or sharp bends 

can lead to the hoses becoming clogged and can therefore 

prevent proper condensate discharge.

If it is necessary to neutralise condensation produced in the 

chimney, we recommend to connect the condensation drains of 

boiler and chimney using a tee connector and then get them to 

the neutraliser inlet.

 

9

Make sure that you tighten the hose clamps sufficiently.

Содержание TAU 2100 N

Страница 1: ...cod Doc 0096458 rev 0 10 2019 TAU 2100 2600 N EN INSTALLATION TECHNICAL ASSISTANCE SERVICE AND SYSTEM MANAGEMENT MANUAL...

Страница 2: ...are specially trained to keep your boiler efficient and cheap to run They also stock any original spare parts that might be required This instruction manual contains important instructions and precaut...

Страница 3: ...11 2 5 Useful information 12 3 INSTALLER 13 3 1 Unpacking the product 13 3 2 Overall dimensions and weights 14 3 3 Handling 15 3 4 Installation premises 16 3 5 Positioning of sensor sockets 17 3 5 1 W...

Страница 4: ...nd must ALWAYS accompany the boiler even if it is sold to another owner or transferred to another user or to another installation If you damage or lose this manual order a replacement immediately from...

Страница 5: ...trol panels of the RIELLOtech range which take into account the dif ferent operating functions the needs of the heating system and the various devices used on them Note for additional information see...

Страница 6: ...n window with pressure meas urement fitting 3 Door 4 Body interior inspection flange 5 Outlet 6 Safety device fitting 7 Heating return high temperature 8 Combustion chamber 9 Heating return low temper...

Страница 7: ...20164364 20163867 RLS 410 M MX 20087649 x 20163867 RLS 310 E MX 20087643 x 20164364 20163867 RLS 410 E MX 20087645 x 20163867 GAS PREMIX RX 2500 S E 20148881 x 20164364 20163866 RX 3000 S E 20148882...

Страница 8: ...burner s own manual RS gas RLS gas Light oil burner RX premix burner If you are installing a new boiler but re using an old burner always perform the following checks Make sure that the performance o...

Страница 9: ...ow tem perature mode n1 with return 30 C GCV NCV 97 9 97 9 108 7 108 7 Losses from stack for sensible heat Qmax 1 5 Losses from casing with burner on 0 3 Constant pressure drop P max 0 2 Flue gas temp...

Страница 10: ...ust the timer thermostat if installed or the tempera ture control to the desired temperature 20 C Turn the boiler s mains power switch ON Turn the control panel power switch ON and make sure that the...

Страница 11: ...gents 0 0Never clean the boilerwithout first disconnecting it from the mains electricity supply by turning the mains power switch and the control panel switch OFF 9 9The combustion chamber and flue pi...

Страница 12: ...information Seller Mr Address Tel Technical Assistance Service Mr Address Tel Installer Mr Address Tel Date Work done Fuel oil supplier Mr Address Tel Date Quantity supplied Date Quantity supplied Da...

Страница 13: ...velope H containing Instruction manual Technical data plate adhesive to be applied to the panelling when installing the boiler Hydraulic test certificate Conventional warranty conditions 9 9The instru...

Страница 14: ...LER INSTALLER 3 2 Overall dimensions and weights P P1 H1 H L1 L DESCRIPTION TAU N 2100 2600 L 1750 1850 mm L1 1800 1900 mm P 4020 4425 mm P1 3612 4024 mm H 1945 2070 mm H1 1870 2128 mm Net weight 4750...

Страница 15: ...art of the boiler Proceed as follows to move the boiler and remove the packaging Remove the protective film Move the boiler to the place of installation use a crane for lifting and using only the lift...

Страница 16: ...the front door opened without having to remove the burner 9 9For Belgium boilers must be installed according to the NBN D51 003 standard the NBN B61 001 standard output 70 kW 9 9When installing the b...

Страница 17: ...Flow sensor socket connector 1 2 70mm 150mm 70mm 150mm 2 Overtemperature protection 1 2 120mm 190mm 120mm 190mm 3 Return sensor socket connector 1 2 120mm 150mm 120mm 150mm 4 Flue gases sensor socket...

Страница 18: ...60 70 80 90 100 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 280 290 300 TAU N 2100 TAU N 2600 Flow rate m3 h The curves refer to a density of 9...

Страница 19: ...rst time once it is filled and the air expelled it should never need to be topped up again Systems should also be operated at maximum working tem perature the first time they are started up in order t...

Страница 20: ...all applicable legislation 9 9Circuits filled with anti freeze must be fitted with water disconnectors DESCRIPTION TAU N 2100 2600 1 System delivery DN200 PN6 DN200 PN6 DN 2 2nd return High temperatur...

Страница 21: ...9 9Domestic hot water and central heating circuits must be completed with expansion vessels of adequate capacity and suitable correctly sized safety valves The discharge of safety valves and applianc...

Страница 22: ...RN LT RETURN CENTRAL HEATING SUPPLY MAKE UP WATER 1 2 1 2 1 2 1 Boiler 2 Burner 3 Disconnect valves 4 Central heating system pump 5 Non return valves 6 Automatic vent valve 7 Boiler safety valve 8 Boi...

Страница 23: ...AL HEATING SUPPLY 1 2 1 2 1 Boiler 2 Burner 3 Disconnect valves 4 Central heating system pump 5 Non return valves 6 Automatic vent valve 7 Boiler safety valve 8 Boiler drain cock 9 Y filter 10 Pressur...

Страница 24: ...N LT CENTRAL HEATING RETURN CENTRAL HEATING SUPPLY 1 2 1 2 1 2 1 Boiler 2 Burner 3 Disconnect valves 4 Central heating system pump 5 Non return valves 6 Automatic vent valve 7 Boiler safety valve 8 Bo...

Страница 25: ...1 2 1 2 1 2 COLD WATER INLET 1 Boiler 2 Burner 3 Disconnect valves 4 Central heating system pump 5 Non return valves 6 Automatic vent valve 7 Boiler safety valve 8 Boiler drain cock 9 Y filter 10 Pre...

Страница 26: ...top fitting H2 O L 3 10 Neutralising the condensate TYPE N3 NEUTRALISATION KIT The TYPE N3 neutralisation units were designed for systems equipped with the central heating plant condensate outlet trap...

Страница 27: ...he boiler condensate drain fitting using the flexible hose C supplied This condensate drain hose is specially made to prevent combustion fumes escaping into the atmosphere The outlet fitting B of the...

Страница 28: ...e condensate boiler condensate at discharge or neutralisation of condensate 9 9The stack must guarantee the minimum draught specified by applicable technical standards assuming zero pressure at the co...

Страница 29: ...y If you need to reverse the direction of opening remove the boil er s side panel and proceed as follows 9 9Check that the main locking screws 1 are fully tightened 1 Remove the snap ring 2 and the th...

Страница 30: ...y a connection point is pro vided in the centre of the frame to be connected to an effective earthing system Proceed as follows Unscrew the nut and washer 1 from the earth terminal Attach the earth ca...

Страница 31: ...l panel cable grommets Route the electrical cables through them and insert the sensors in their sockets Fasten the control panel A to the panelling using the screws supplied 4 A 3 Fit the side panels...

Страница 32: ...e lower profile of the rear panel 14 hook the profile to the pro vided pins and fix it with two self threading screws 14 Fit the central rear panels 15 16 inserting them from the sides to hook them to...

Страница 33: ...on en condensafvoerleidingen MINSTENS EENMAAL PER JAAR volgens de aanwijzingen in de handleiding voor gebruik en onderhoud Controlar y limpiar el sif n y las tuber as de evacuaci n condensaci n ANUALM...

Страница 34: ...ly bled The condensate discharge siphon has been filled with water The mains power connections to the boiler and its ac cessories burner pump control panel thermostats etc have been properly made 9 9T...

Страница 35: ...formed properly Check that all the electrical connections shown on the control panel wiring diagrams have been performed properly 4 3 Checks during and after initial start up Once the boiler has start...

Страница 36: ...ch OFF Close all the gas cocks Door opening To open the door simply completely unscrew the main locking nuts 1 that support themselves on the structure 1 To avoid dangerous leaks of combustion gases t...

Страница 37: ...racket B If one of these two conditions is not met proceed with the ad justment operations described on the following pages 2 1 B 9 9The pin 1 must not be used as a handle to close the door Door balan...

Страница 38: ...eted tighten the nut 8 completely Check the correct opening closing of the door 8 9 8 Door seal adjustment Loosen the screws 10 of the upper and lower hinge and adjust the position of the door until t...

Страница 39: ...ket wrench A 9 9Make sure that there are no leaks around the boiler door seal If you detect any leakage of fumes increase the tight ening of the door fixing bolts 9 9Make sure that the door is properl...

Страница 40: ...sumption Open the front door 1 Remove the turbulators 2 check their state of wear and the opening of the fins replace if necessary Clean the internal surfaces of the combustion chamber and the flue g...

Страница 41: ...trically disconnected Suitable personal protection equipment The water and fuel shut off valves closed In order to inspect the upper part of the boiler partially empty the boiler before opening inspec...

Страница 42: ...Air in the circuit Check the circuit pressure Check the vent valve The generator is at temperature but the heating system is cold Air in the circuit Bleed the circuit Pump malfunctioning Check unseize...

Страница 43: ...43 TECHNICAL ASSISTANCE SERVICE TECHNICAL ASSISTANCE SERVICE...

Страница 44: ...lo 7 37045 Legnago VR www riello com The manufacturer strives to continuously improve all products Appearance dimensions technical specifications standard equipment and accessories are therefore liabl...

Отзывы: