
15
20035745
GB
Installation
5.4
Installer/Servicer notes for the use of Gas oil with Bio blends up to 10%
During the burner installation, check that the gasoil and bio
fuel blends are in accordance with Riello specifications
(please refer to the chapters "Technical Data" and "Guid-
ance for the use of bio fuel blends up to 10%" within the
burner technical manual).
If a Bio blend is in use the installer must seek information
from the end user that their fuel supplier can evidence that
the blends of fuel conform to the relevant standards.
Check that the materials used in the construction of the oil
tank and ancillary equipment are suitable for bio fuels, If not
these must be upgraded or replaced with Bio compatible
parts.
Particular attention should be given to the oil storage tank
and supply to the burner. Riello recommends that existing
oil storage tanks are cleaned, inspected and any traces of
water are removed BEFORE bio fuel is introduced (Contact
the tank manufacturer or oil supplier for further advice). If
these recommendations are not respected this will increase
the risk of contamination and possible equipment failure.
In line oil filters should be replaced making sure that they are
Bio compatible. Riello recommends a good quality bio com-
patible oil filter at the tank and a secondary 100 micron filter
are used to protect the burner pump and nozzle from con-
tamination.
The burner hydraulic components and flexible oil lines must
be suitable for bio fuel use (check with Riello if in doubt).
Riello have carefully chosen the specification of the bio
compatible components including the flexible oil lines to
protect the pump, safety value and nozzle. The Riello war-
ranty is dependent upon the use of Riello genuine compo-
nents including the oil lines, being used. The burner must
be commissioned and combustion parameters set to appli-
ance manufacturer's recommendations.
Regularly check visually for any signs of oil leakage from
seals, gaskets and hoses.
It is strongly recommended that with Bio fuel use, oil filters
are inspected and replaced every 4 months. More regularly
where contamination is experienced.
During extended periods of non operation and/or where
burners are using oil as a standby fuel, it is strongly recom-
mended that the burner is put into operation for shorts peri-
ods at least every three months.
5.5
Operating position
The burner is designed to work only in the positions
1, 2, 3
and
4
.
Installation
1
is preferable, as it is the only one that allows per-
forming maintenance operations as described in this manual.
Installations
2, 3
and
4
permit operation but make maintenance
and inspection of the combustion head difficult, page 27.
5.6
Removal of the locking screws from the shutter
WARNING
Any other position could compromise the correct
working of the appliance.
Installation
5
is prohibited for safety reasons.
Fig. 8
2
3
4
5
1
S8284
WARNING
Remove the screws and the nuts 1)-2)(Fig. 9), be-
fore installing the burner on the boiler.
Replace them with the screws 3) M12 X 25 sup-
plied with the burner.
1
2
1
2
3
3
Fig. 9
D12015
Содержание RL 300/B MZ
Страница 2: ......
Страница 38: ...20035745 36 GB Appendix Electrical panel layout RL 300 B MZ ...
Страница 39: ...37 20035745 GB Appendix Electrical panel layout RL 400 B MZ ...
Страница 40: ...20035745 38 GB Appendix Electrical panel layout ...
Страница 41: ...39 20035745 GB Appendix Electrical panel layout ...
Страница 44: ...Subject to modifications RIELLO S p A I 37045 Legnago VR Tel 39 0442 630111 http www rielloburners com ...