INSTAllATION
11
Assembly:
—
fasten the unit to the upper part of the metallic support
—
check that the unit is correctly hooked by moving it to the
left and to the right
—
place the unit in the middle of the metallic support
To ease the connections:
1 Pipe locking bracket
2 Packaging polystyrene protection
1
2
—
use the pipe locking bracket to space the unit lower side
from the metallic support
If there is a connection box:
—
use one of the polystyrene protections from the packaging
After performing the connections:
—
hook the unit lower part
—
by pushing it perpendicularly toward the metallic support
2.10 Condensate discharge position
The standard position of the condensate discharge hole is on
the left-hand side of the device when looking at if from behind.
It is possible to move it to the right-hand side. To do so, proceed
as follows:
1 Protective cap
1
1
—
remove the protection plug from the prearranged connec-
tion on the right-hand side
1 Drainage pipe
2 Condensation discharge
1
2
—
remove the drainage pipe on the left-hand side and place
it on the right-hand side
—
fit the protection plug on the spare hole on the left-hand
side
2.11 Refrigerating connection
The dimensions and positions of
R
AMW ST cooling connec-
tions are shown hereunder.
1 Gas line connection
2 Liquid line connection
2
1