background image

USER

2

This manual, Code 20042453 Rev. 1 (01/13) is made up 
of 16 pages.

The following symbols are used in this manual:

=  Identifies actions that require caution and ade-

quate preparation.

=  Identifies actions that you MUST NOT do

CONTENTS

General safety information 

4

Precautions 4
Control panel 

5

Start-up 7
Temporary shutdown 

10

Preparing for extended periods of disuse 

10

Cleaning 11
Maintenance 11
Useful information 

12

Содержание INSIEME CONDENS 26 B

Страница 1: ...INSTRUCTION FOR THE USER CONDENSING BOILERS 26 B 26 BK 35 B 35 BK 26 BK 35 BK 26 B 35 B ...

Страница 2: ...anual b Identifies actions that require caution and ade quate preparation a Identifies actions that you MUST NOT do CONTENTS General safety information 4 Precautions 4 Control panel 5 Start up 7 Temporary shutdown 10 Preparing for extended periods of disuse 10 Cleaning 11 Maintenance 11 Useful information 12 ...

Страница 3: ...gularly by r s Technical Assistance Service Their personnel are specially trained to keep your boiler efficient and cheap to run Technical Assistance Centres also stock any original spare parts that might be required This instruction manual contains important instructions and precautions that must be observed to ensure the trouble free installation and efficient functioning of your boiler Please a...

Страница 4: ...ose this manual order a replacement immediately from your local r Technical Assistance Centre bThe boiler must be installed by a legally qualified hea ting engineer On comple tion of the installation the heating engineer must issue the owner with a declaration of conformity confirming that the instal lation has been comple ted to the highest standards in compliance with the instructions provided b...

Страница 5: ...rical power indicator Lights to show that the system is receiving electrical power 5 Burner lockout indicator Lights to show that a burner lockout has occurred 6 Manual reset for safety thermostat Allows you to reset the boiler if the safety thermostat trips Unscrew the protective cover to access the reset button 7 Function indicators 8 Manual reset for flue gas thermostat Allows you to reset the ...

Страница 6: ... indicator Lights to show that a burner lockout has occurred 6 Summer I Winter II selector 7 Storage cylinder temperature gauge Displays the temperature of the domestic hot water 8 Manual reset for safety thermostat Allows you to reset the boiler if the safety thermostat trips Unscrew the protective cover to access the reset button 9 Storage cylinder thermostat Allows you to set the temperature of...

Страница 7: ... check that the pressure in the heating circuit is over 1 bar but below the maxi mum limit specified for the boiler If water pressure is low contact r s Technical Assistance Service Set the room thermostat to the required temperature 20 C or if the system has a timer or temperature controller make sure that this is switched On and adjusted to the required temperature 20 C Turn the system s mains p...

Страница 8: ...s before resetting the burner To reset the burner press the button light on the burner Wait for the burner to complete the entire start up cycle again up to the ignition of the flame IMPORTANT Before it starts pre ventilation pre purging the oil burner pre heats the fuel oil for about 2 and half minutes The first time the burner starts up for the winter ignition problems can occur if the temperatu...

Страница 9: ...edly make sure that the flue gas vent pipe is not blocked and that the flue has been installed correctly bNo warning signal is given if the safety thermostat trips but the fact that is has tripped can be seen from the boiler temperature gauge T 110 C Proceed as follows to reset the safety thermostat Wait until boiler temperature falls below 80 C Remove the safety thermostat cover Press the manual ...

Страница 10: ...ler thermostat to about the middle of the section with one line Turn the room thermostat to about 10 C or select the frost protection function If the boiler is not going to be used for an extended period of time proceed as follows to prepare it for shut down Turn the function selector to OFF I and make sure that the green power indicator goes out Turn the system s mains power switch OFF Close the ...

Страница 11: ...aNever clean or service the boiler without first disconnecting it from the mains electricity supply by turning the main power switch OFF Please remember that THE PERSON RESPONSIBLE FOR SYSTEM MANAGEMENT MUST ENSURE THAT PROFESSIONALLY QUALIFIED PERSONNEL UNDERTAKE PERIODIC MAINTENANCE AND COMBUSTION EFFICIENCY MEASUREMENTS r s Technical Assistance Service is qualified to satisfy these legal requir...

Страница 12: ...eller Mr Address Tel Technical Assistance Service Mr Address Tel Fuel oil supplier Mr Address Tel Installer Mr Address Tel Date Work done Date Quantity supplied Date Quantity supplied Date Quantity supplied Date Quantity supplied ...

Страница 13: ...USER 13 ...

Страница 14: ...USER 14 ...

Страница 15: ......

Страница 16: ...Tel 0442630111 Fax 0442630371 www riello it As part of the company s ongoing commitment to perfecting its range of products the appearance dimensions technical data equipment and accessories may be subject to variation Cod 20042453 ...

Отзывы: