background image

20144819

GB

Technical description of the burner

4.7

Firing rates

The  burner  output  is  selected  from  within  the  area  of  the  dia-
grams.
This area is known as the FIRING RATE and provides the burner
output according to the pressure in the combustion chamber.
The work point may be found by plotting a vertical line from the
desired output and a horizontal line from the corresponding pres-
sure  in  the  combustion  chamber  The  intersection  of  these  two
lines is the work point which must lie within the FIRING RATE.

Example: 

for GAS 3 the area is delimited by:

the axis of the 130 - 350 kW outputs

the axis of the pressures in the comb. chamber 0 + 7 mbar

the maximum pressure curve in comb. chamber

If the burner develops an output of 240 kW at a pressure in com-
bustion chamber of 5 mbar, the work point is found on the maxi-
mum pressure curve. This curve has been established with safety
margins and therefore it is possible to use the entire area of the
FIRING RATE beneath this curve.
Warning: 

The burner can also operate with the combustion chamber in de-
pression.

WARNING

The  firing  rate  value  (Fig.  2)  has  been  obtained
considering an ambient temperature of 20 °C, an
atmospheric pressure of 1,013 mbar (approx. 0 m
a.s.l.), and with the combustion head adjusted as
shown on page 16.

Pre

ssu

re i

n combustion

 

 c

hamber - 

mb

ar

Heat output

 Fig. 2

GAS 3

GAS 4

20144735

D289

KW

Mcal/h

KW

Mcal/h

GAS 5

GAS 6

D290

D291

Pressure

 in co

mb

ustion 

 ch

amber - 

mbar

Heat output

Heat output

Heat output

Содержание GAS 3

Страница 1: ...ation use and maintenance instructions 20144819 3 01 2019 Forced draught gas burners One stage operation CODE MODEL TYPE 3751918 GAS 3 519 T1 3751617 GAS 4 516 T1 3751717 GAS 5 517 T1 3751817 GAS 6 51...

Страница 2: ...Translation of the original instructions...

Страница 3: ...n 13 5 1 Notes on safety for the installation 13 5 2 Handling 13 5 3 Preliminary checks 13 5 4 Operating position 14 5 5 Preparing the boiler 14 5 5 1 Boring the boiler plate 14 5 5 2 Blast tube lengt...

Страница 4: ...eset 26 6 8 3 Visual diagnostics 26 6 8 4 Software diagnostics 26 7 Maintenance 27 7 1 Notes on safety for the maintenance 27 7 2 Maintenance programme 27 7 2 1 Maintenance frequency 27 7 2 2 Safety t...

Страница 5: ...ds EN 676 EN 12100 and according to the European Directives GAR 2016 426 EU only 519 T1 Gas Devices Directive MD 2006 42 EC Machine Directive LVD 2014 35 EU Low Voltage Directive EMC 2014 30 EU Electr...

Страница 6: ...ed out correctly may cause damage to the ma chine and or injury to people DANGER DANGER LIVE COMPONENTS This symbol indicates operations which if not car ried out correctly lead to electric shocks wit...

Страница 7: ...of damage to things or injury to people if such damage injury was due to any of the following causes incorrect installation start up use and maintenance of the burner improper incorrect or unreasonab...

Страница 8: ...ose parts envisaged by the manufacturer can be replaced 3 2 Personnel training The user is the person body or company that has acquired the machine and intends to use it for the specific purpose He is...

Страница 9: ...230 50 Direct 3751617 GAS 5 TC 3 230 400 50 Direct 3751717 GAS 6 TC 3 230 400 50 Direct 3751817 Country of destination Gas category SE FI AT GR DK ES GB IT IE PT IS CH NO I2H DE I2ELL NL I2L I2E I2 43...

Страница 10: ...arts list No 1 MODEL GAS 3 GAS 4 GAS 5 GAS 6 Type 519 T1 516 T1 517 T1 518 T1 Electrical supply 1 PH 1N 230V 50 Hz Electrical supply 3 PH 3 230 400V 10 50 Hz Electrical motor rpm kW V A 2750 0 250 230...

Страница 11: ...amber 0 7 mbar the maximum pressure curve in comb chamber If the burner develops an output of 240 kW at a pressure in com bustion chamber of 5 mbar the work point is found on the maxi mum pressure cur...

Страница 12: ...set in relation to special test boilers accord ing to EN 676 regulations In Fig 3 you can see the diameter and length of the test combus tion chamber Example Output 1500 Mcal h diameter 80 cm length...

Страница 13: ...S 3 4 models 6 Motor contactor and thermal relay in GAS 5 6 models 7 Terminal board 8 Cable grommets for electrical wiring to be carried out by the installer 9 Control box with lockout pilot light and...

Страница 14: ...the development of conden sate and humidity Otherwise before switching on again make sure that the entire control box is perfectly dry Static charges must be avoided since they can damage the control...

Страница 15: ...be free from hazardous mixes e g chloride fluoride halo gen if present it is highly recommended to carry out cleaning and maintenance more frequently WARNING The handling operations for the burner can...

Страница 16: ...on device in refractory material 7 must be in serted between the boiler refractory 8 and the blast tube 6 This protective fettling must not compromise the extraction of the blast tube WARNING The burn...

Страница 17: ...e them Finally put back the fan 4 Fig 9 on the slide bars 3 put back the screws 2 and with the burner open proceed to the adjustment of the combustion head 5 6 Positioning the probe electrode If the p...

Страница 18: ...W boiler Considering an efficiency of 89 the burner should deliver about 270 kW The diagram Fig 13 shows that the gas and air adjustments for this burner output are carried out on notch 4 5 NOTE The d...

Страница 19: ...00 kW 9 Gasket for flanged versions only 10 Pressure adjuster 11 Train Burner adaptor supplied separately P2 Upstream pressure of valves adjuster P3 Upstream pressure of the filter L Gas train supplie...

Страница 20: ...that there are no gas leaks Pay attention when handling the train danger of crushing of limbs Make sure that the gas train is properly installed by checking for any fuel leaks The operator must use th...

Страница 21: ...mbustion chamber 2 mbar 10 3 2 8 3 mbar A pressure of 5 3 mbar column 1 corresponds in Tab F to an output of 277 kW This value serves as a rough guide the effective output must be measured at the gas...

Страница 22: ...x to per form checks of its own start up efficiency Normally burner stopping is guaranteed by the boiler s thermostat pres sure switch If this is not the case a time switch should be fitted in series...

Страница 23: ...ry CABLE SECTIONS Section not indicated 1 5 mm2 Tab G 5 10 Calibration of the thermal relay only 3pH versions This is required to avoid motor burn out in the event of a signifi cant increase in power...

Страница 24: ...he flame does not appear and the control box goes into lockout reset and wait for a new ignition attempt If ignition is still not achieved it may be that gas is not reaching the combustion head within...

Страница 25: ...to measure the ignition output Remove the UV sensor 29 Fig 4 on page 11 the burner starts and locks out after the safety time Perform 10 ignitions with consecutive lockouts Read the quantity of gas bu...

Страница 26: ...the burner operating in the 2nd stage increase adjustment pressure by slowly turning the relative knob clockwise until the burner stops Then turn the knob anticlockwise by 0 2 kPa 2 mbar and repeat b...

Страница 27: ...lockout within 3s from the opening of the gas valve and 43 s from the closure of the TL re mote control 0s Control remote control TL closes Electrical control box programme starts 2s The fan motor st...

Страница 28: ...linked The number of blinks indicates the reason for the malfunctioning refer to the coding in Tab M on page 31 6 8 4 Software diagnostics Gives an analysis of the life of the burner through optical c...

Страница 29: ...or open ing closing position indicators that are activated when they are powered 7 2 3 Checking and cleaning Burner Check that there are not excess wear or loosen screws The screws securing the electr...

Страница 30: ...Safety components The safety components should be replaced at the end of their life cycle indicated in the following table The specified life cycles do not refer to the warranty terms indi cated in th...

Страница 31: ...rner by means of the main system switch DANGER Close the fuel interception tap Wait for the components in contact with heat sources to cool down completely Fig 28 D202 WARNING When the burner is closi...

Страница 32: ...t switch on and the lock out appears Air pressure switch in operating position Adjust or replace The burner switches on but then stops in lockout Air pressure switch does not switch owing to lack of a...

Страница 33: ...ce The burner continues to repeat the start up cy cle without lockout The gas pressure in the gas mains lies very close to the value to which the gas pressure switch has been set The sudden drop in pr...

Страница 34: ...rial and fully encloses the burner The casing is mounted on wheels can be easily moved for burner inspection A Appendix Accessories COD 3000605 L 185 L1 320 mm GAS 3 COD 3000606 L 187 L1 320 mm GAS 4...

Страница 35: ...articularly subject to radio dis turbance emission of signals exceeding 10 V m owing to the presence of an INVERTER or in applications where the length of the thermostat connections exceeds 20 metres...

Страница 36: ...ASE DIAGRAM A Electrical system external connections without valve leak control burners GAS 3 4 SINGLE PHASE DIAGRAM B Electrical system external connections with valve leak control burners GAS 5 6 TH...

Страница 37: ...35 20144819 GB Appendix Electrical panel layout GAS 3 4 SINGLE PHASE D2855 DIAGRAM A...

Страница 38: ...20144819 36 GB Appendix Electrical panel layout GAS 5 6 THREE PHASE D2861 DIAGRAM A...

Страница 39: ...37 20144819 GB Appendix Electrical panel layout 20144739 GAS 3 4 SINGLE PHASE DIAGRAM B...

Страница 40: ...20144819 38 GB Appendix Electrical panel layout DIAGRAM B GAS 5 6 THREE PHASE 20144741...

Страница 41: ...39 20144819 GB Appendix Electrical panel layout GAS 3 4 SINGLE PHASE DIAGRAM C 20144742...

Страница 42: ...20144819 40 GB Appendix Electrical panel layout DIAGRAM C GAS 5 6 THREE PHASE 20144743...

Страница 43: ...S1 Lockout signal of the remote leak detection control TL Limiter control device shuts down the burner when the temperature or the boiler pressure reaches the pre set value TS Safety limit control dev...

Страница 44: ...Subject to modifications RIELLO S p A I 37045 Legnago VR Tel 39 0442 630111 http www riello it http www riello com...

Отзывы: