![Riello G5RT MC Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/riello/g5rt-mc/g5rt-mc_installation-use-and-maintenance-instructions_1459524012.webp)
20013744
10
GB
FAILURE DETECTION ON HEATING DEVICE
NORMAL OPERATION (Fig. 8)
The plug fitted in the panel is placed in the position corresponding to
“Resistance ON”
.
When the remote control closes, the
LED
lights up and, after about two minutes, the burner starts up.
BURNER DOES NOT OPERATE
1)
If the
LED
is
OFF
, the heating resistance placed in the nozzle-holder is off.
2)
If the
LED
is
ON
and nevertheless the burner does not run, place the plug in the position corresponding
to
“Resistance OFF”
(Fig. 9).
If the motor runs, the delaying device inside the control box is out of order.
3)
If the motor does not run, it means that the failure is neither in the panel nor in the resistance, but else-
where.
BURNER START-UP CYCLE
*
It depends on the selector position.
CONTROL BOX 531SE
PLUG
PLUG
S7060
LED
LED
Resistance OFF
Resistance ON
Fig. 8
Fig. 9
*
S7059
~
120s
D5814
~
120s
~
12s
~
12s
~
5s
~
5s
Normal
Lock-out, due to light-failure
Thermostat
Resistance
Motor
Ignition transformer
1
st
stage valve
2
nd
-3
rd
stage valve
Lock-out lamp
ATTENTION
Содержание G5RT MC
Страница 14: ...20013744 CN RIELLO Technical Assistance Centre Assistance Centre Maintenance Contract...
Страница 21: ...7 20013744 CN 6mm 2 1 CO2 CO2 3 1 3 0 3 2 3 6 D5587 1 5 3...
Страница 22: ...20013744 8 CN 6 1 1 9 10 1 9 10bar 4 5 2 2 2 3 1 2 3 3 6 7 1 6 2 3 15bar 8 5 1 2 3 6 7 9 10 4 5 8 D8384 6...
Страница 25: ...11 20013744 CN 1 CO2 CO ppm NOx ppm...
Страница 26: ......
Страница 27: ......