40
INSTALLATION OF THE APPLIANCE
INSTALLATION OF THE APPLIANCE
INSTALLATION OF THE APPLIANCE
INSTALLATION OF THE APPLIANCE
INSTALLATION OF THE APPLIANCE
The BAG
2
MIX can be wall-mounted or “built-in”, and can
be located near the boiler or at a distance, provided the
length of the plumbing and electrical connections between
the boiler and the BAG
2
MIX unit do not exceed 15 metres.
The BAG
2
MIX can be installed in positions exposed to
the weather (rain, sun, ice, etc.) only if in “built-in”
installation.
Note: The wiring supplied is 2 metres long.
In the case of installation of BAG
2
MIX with built in
boilerss and electric connection on the lower side of
the unit, it is necessary that the wrinkled pipe comes
out of approx 10 cm.
Wall-mounted installation
When the BAG
2
MIX is wall-mounted it must be supported
by two expanding wall anchors (supplied) that are suitable
for the type of wall and weight of the equipment.
We recommend using pipe sleeves built into the wall in
order to limit the infiltration of water.
These pipe sleeves are not supplied with the unit.
Electrical protection level IP10D.
“Built-in” installation
When the BAG
2
MIX unit is built-in:
-
Provide the building work, complete with a niche of
suitable size for the BAG
2
MIX, to suit the thickness of
the wall (minimum indicative dimensions shown in the
figure).
-
Position the BAG
2
MIX in position, and remember to
open out the two support lugs to fix it more securely.
-
Protect the side edges and front while building in the
device.
Since the plumbing and electrical connections between
the system and the BAG
2
MIX must be contained within
the overall size of the device itself, first position the BAG
2
MIX and then the entry and exit pipes for the system and
the conduiting for the electric cables.
Electrical protection level IPX4D.
INSTALLATOR
lug