background image

INSTAllATION

15

Use copper pipes for cooling systems.

Use connecting pipes and tools appropriate for the system's 
refrigerant.

 

0

It is forbidden to use second-hand cooling lines since their 
flare connection seal is not guaranteed.

 

0

It is forbidden to use pre-charged cooling lines.

 

0

It is forbidden to carry out welding operations with refrig-
erant inside the cooling circuit. If necessary, the refrigerant 
must be recovered and the circuit must be cleaned with ni-
trogen without oxygen.

Connections

 

position the connecting pipes

OK

OK

OK

Plug the pipe ends in order to prevent water or debris from 
flowing in.

before threading the lines through the hole in the wall, 
close the lines ends.

 

cut the pipe end square using a pipe cutter

 

remove burrs keeping the cut edge facing down

 

remove the flare nut on the unit connection

 

insert it into the connection pipe

 

flare the tube

A

Pipe Ø

A

mm

inches

mm

6,35

1/4

9,1

9,52

3/8

13,2

12,70

1/2

16,6

15,88

5/8

19,7

1   Key
2   Torque  wrench
3   Flare  nut

2

3

1

Pipe Ø

Tightening torque

mm

inches

Nm

6,35

1/4

18

9,52

3/8

42

12,70

1/2

55

15,88

5/8

60

A

Pipe Ø

A

mm

inches

mm

6,35

1/4

17

9,52

3/8

22

12,70

1/2

26

15,88

5/8

29

 

bring line ends with flare connection close to their cou-
pling on the unit

 

manually rotate the flare nuts by 3 - 4 turns

 

tighten the connections using a spanner and a counter 
spanner

Use a torque wrench to tighten so as to prevent damage to 
flare nuts and gas leaks.

During the connection, keep the leak finder on and close to 
the unit so that it signals any refrigerant leak.

Avoid using the refrigerant oil on the external part of the 
flaring.

After connecting the cooling pipes:

 

create a vacuum inside the pipes

 

check for refrigerant leaks

 

apply thermal insulating material on the joints

Содержание AARIA START

Страница 1: ...AARIA START SERIES R32 11 2017 cod Doc 0086715 rev 0 EN INSTALLATION AND TECHNICAL SERVICE INSTRUCTIONS...

Страница 2: ...mps are compliant with the following European Directives Low Voltage Directive 2014 35 EU Electromagnetic Compatibility Directive 2014 30 EU RoHS Directive 2011 65 EU ErP Directive 2009 125 EC and Reg...

Страница 3: ...Place of installation p 12 2 7 Recommended distances p 12 2 8 Positioning p 13 2 9 Installation on old systems or systems in need of upgrading p 14 2 10 Refrigerating connection p 14 2 11 Wiring diag...

Страница 4: ...operate carefully so as to avoid damaging the gas circuit and the fin bank 9 Do not place any inflammable object spray cans within a 1 metre radius from the air expulsion 9 According to EU Regulation...

Страница 5: ...board that is triggered in order to adjust the flow of refrigerant gas or to stop the unit in case of overtemperature 40 C outdoor air temperature sensor which transmits the de tected value to the el...

Страница 6: ...lve 15 Terminal board for electric connec tions 16 Electric panel cover 1 2 3 4 5 6 7 8 9 10 11 12 14 15 16 13 MODEL 35 1 Upper panel 2 Fan protection grille 3 Connections cover 4 Handle for handling...

Страница 7: ...xpansion valve 15 Terminal board for electric connec tions 16 Electric panel cover 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 MODEL 70 1 Upper panel 2 Fan protection grille 3 Connections cover 4 Handle fo...

Страница 8: ...ed air flow 3 40 4 20 6 00 8 10 kW Absorbed power at rated air flow 0 91 1 13 1 61 2 18 kW COP 3 71 kW kW Capacity at maximum air flow 4 60 5 40 6 90 10 00 kW Absorbed power at maximum air flow 1 50 1...

Страница 9: ...tics Power supply 230 1 50 V Ph Hz Compressor Compressor Rotary Type Oil FW50S Type Oil charge 0 32 0 27 0 35 0 52 l Refrigerant R32 Type Refrigerant charge 0 70 0 72 0 95 1 20 kg Fan Fan Axial Type Q...

Страница 10: ...ating it During the summertime the cycle is reversed and the thermal energy is extracted from the room air which is cooled and is delivered to the outdoor air A Outdoor unit B Indoor unit 1 Compressor...

Страница 11: ...nical Service in English Warranty Spare parts labels energy label etichetta gas refrigerante contact sheet It is also supplied as kit Condensate outlet hose 4 x vibration dampers screws to connect ref...

Страница 12: ...ch as it can be dangerous It must be disposed of ac cording to the regulations in force 2 6 Place of installation The location of R AARIA START devices must be determined by the system s designer or b...

Страница 13: ...llow for the condensate discharge 9 If the device is installed in an area that is subject to heavy snowfalls place the unit in a raised position so as to pre vent the air flow from being blocked or in...

Страница 14: ...1 2 Pollici Charge connection 1 2 Pollici Liquid line connection 6 35 mm Gas line connection 9 52 12 7 mm Charge connection 12 7 mm To access the cooling connections unscrew the fastening screw push d...

Страница 15: ...facing down remove the flare nut on the unit connection insert it into the connection pipe flare the tube A Pipe A mm inches mm 6 35 1 4 9 1 9 52 3 8 13 2 12 70 1 2 16 6 15 88 5 8 19 7 1 Key 2 Torque...

Страница 16: ...rvice it may be required to open and close the valves A Opening B Closing 1 Service connection blanking plug 2 On off valve shaft 3 Refrigerating pipe attachment 4 On off valve cover plug 5 Hex wrench...

Страница 17: ...ut off valves closed A High pressure B Low pressure 1 Pressure gauge unit 2 Vacuum pump 3 3 way valve service connection A B 1 2 3 connect the vacuum pump to the pressure gauge unit connect the pressu...

Страница 18: ...9 Carefully check for absence of leakages from the closing point of the plug 9 Do not force beyond the stop point to prevent damaging the shaft and causing leakage as a consequence 9 Once the check h...

Страница 19: ...sensor CS TC Defrosting sensor Outdoor air sensor HW Power supply 230V 1F 50Hz CN17 MODEL 35 1 N 3 C 2 L GR GR MODULE BOARD MAIN PCB BOARD BLOCK R W B C W S V R U COMPRESSOR M BL OR P U V W W B AC N A...

Страница 20: ...pressor sensor Defrosting sensor Outdoor air sensor TC CS HW 2 12 Electrical connection AARIA START It leaves the factory completely wired and only re quires a connection to the electrical power grid...

Страница 21: ...to connect to the terminal board For the sizing of the electrical power cables and safety devices use the following table Model 25 35 50 70 Electrical characteristics Power supply 230 1 50 V Ph Hz Pr...

Страница 22: ...and differential protection in stalled near the equipment connect the device to a properly functioning earthing sys tem make sure that the electrical power supply system is com pliant with the current...

Страница 23: ...of the above listed controls have problems turn the device off and call the Technical Service immediately 9 Do not touch the device pipes to prevent potential burns 9 Take anti static precautions in...

Страница 24: ...erations MUST be carried out under the fol lowing conditions cold device device NOT supplied with electric power suitable personal protection equipment 0 0 It is forbidden to open the access doors and...

Страница 25: ...scharge The unit resets automatically when the temperature drops under 110 C After 3 consecutive interventions in 30 minutes the unit resets after problem resolution 9 Fan motor malfunction After 3 co...

Страница 26: ...resets after problem resolution 24 Compressor motor overcurrent The unit resets automatically 25 Overcurrent protection for single phase of the compressor The unit resets after problem resolution In...

Страница 27: ...rials shall be disposed of separately so as to re cover and recycle them Refrigerant and oil must be recovered and not dispersed into the environment At the end of its ser vice life the device shall b...

Страница 28: ...39 0442 630111 fax 39 0442 630371 www riello it As the manufacturer is constantly improving its products the aesthetic or dimensional features the technical data the equipment and accessories indicat...

Отзывы: