background image

6

GENERAL

GENERAL

TECHNICAL SPECIFICATIONS

DESCRIPTION

7000 ACI PLUS (Hot-cold version)

800

1000

1500

2000

Type of buffer tank

Non vitrified

Tank layout

Vertical

Buffer tank capacity

732

855

1420

2013

l

Diameter with insulation

990

990

1200

1300

mm

Diameter of storage cylinder without insulation

790

790

1000

1100

mm

Height with insulation

1800

2050

2165

2480

mm

Height without insulation

1725

1975

2090

2405

mm

Insulation thickness

100

mm

Maximum operating pressure

6

bar

Maximum operating temperature

99

°C

Net weight with insulation

115

170

185

305

kg

Diameter of sensor socket

8

mm

Discharges according to EN 12897:2006

(

T=45 °C, ambient 20°C and storage at 65°C)

131

139

168

190

W

3,14

3,34

4,03

4,03

kWh/24h

Insulation type

20 mm PEXL + 80 mm Soft PU

DESCRIPTION

7000 ACI PLUS C (Cold version)

800

1000

1500

2000

Type of buffer tank

Non vitrified

Tank layout

Vertical

Buffer tank capacity

732

855

1420

2013

l

Diameter with insulation

850

850

1060

1160

mm

Diameter of storage cylinder without insulation

790

790

1000

1100

mm

Height with insulation

1725

1975

2090

2405

mm

Height without insulation

1725

1975

2090

2405

mm

Insulation thickness

30

mm

Maximum operating pressure

6

bar

Maximum operating temperature

99

°C

Net weight with insulation

101

150

164

279

kg

Diameter of sensor socket

8

mm

Discharges according to EN 12897:2006

(

T=45 °C, ambient 20°C and storage at 65°C)

471

528

726

913

W

11,3

12,67

17,42

21,91

kWh/24h

Insulation type

Soft PU shells

(*)

  In accordance with DIN 4708 with a 

Δ

T of 20°C (80°/60°C) at the coil.

LOCATION OF SENSORS

R

 

7000 ACI PLUS

 buffer tanks incorporate sockets for temperature control sensors.

 

9

The actual positioning of sensors depends on what components, water connections and control device are installed.

 

9

The installer is responsible for making all necessary connections to the boiler and solar collectors. Installers must use their 

expertise to ensure proper installation and functioning in compliance with all applicable legislation.

 

9

In case of a probe, any electric junction between probe cable and extensions for the connection to the electric panel must be 

soldered and protected with a sheath or a suitable electric insulation.

Содержание 7000 ACI 60 PLUS

Страница 1: ...cod Doc 0072586 rev 6 09 2017 7000 ACI PLUS EN INSTALLATION OPERATION AND MAINTENANCE MANUAL...

Страница 2: ...ories and details of their compatibil ity refer to the Catalogue ENGLISH Dear heating engineer We would like to congratulate you on having recommended a R buffer tank unit a modern product that s capa...

Страница 3: ...autions 4 3 Description of the appliance 5 4 Identification 5 5 System layout 5 6 Technical specifications 6 7 Location of sensors 6 8 Overall dimensions and water fittings 7 INSTALLER 9 Unpacking the...

Страница 4: ...and must ALWAYS accompany the product even if it is sold to another owner or transferred to another user or to another installation If you lose this manual or der a replacement immediately Keep the p...

Страница 5: ...HER Modell Seriennummer Kode Baujahr Stromversorgung V Hz Speicherinhalt l 067670DE Erdschluss ist Vorschrift Obligatory ground connection Aarding verplicht W Stromaufnahme Max Betriebsdruck Speicher...

Страница 6: ...r without insulation 790 790 1000 1100 mm Height with insulation 1725 1975 2090 2405 mm Height without insulation 1725 1975 2090 2405 mm Insulation thickness 30 mm Maximum operating pressure 6 bar Max...

Страница 7: ...ent not supplied 1 1 2 F 2 F MI CH flow 3 F 4 F RI CH return 3 F 4 F SC Drain 1 F RC Return to boiler 3 F 4 F MC Outlet from boiler 3 F 4 F A 220 220 250 250 mm B 355 355 415 415 mm C 905 1030 1080 12...

Страница 8: ...1500 1200 1200 2315 213 2000 1300 1300 2630 335 7000 ACI PLUS C A B H Gross weight kg 800 900 900 1875 112 1000 900 900 2125 168 1500 1200 1200 2240 190 2000 1200 1200 2555 305 10 HANDLING Once you ha...

Страница 9: ...ks Make sure that the system is fitted with safety and con trol devices in accordance with applicable legislation and standards Make sure that the central heating circuit has been flushed out to remov...

Страница 10: ...act on the environment and save energy before leaving for the weekend or a short break etc provided outdoor temperatures will remain above ZERO simply adjust the buffer tank s temperature control devi...

Страница 11: ...Fit a pressure limiter Fit a flow reducer There are blockages or deposits in the buffer tank Check and clean as necessary Filling pump not functioning Check the pump The water temperature from the bo...

Страница 12: ...The manufacturer strives to continuously improve all products Appearance dimensions technical specifications standard equipment and accessories are therefore liable to modification without notice...

Отзывы: