20146103
20
GB
Installation
5.11.3 Electrical diagram
Air damper opening motor
C
Motor capacitor
CN1
Ionisation probe connector
E
Ignition electrode
h1
1st stage hour counter (230V - 0.1A max.)
h2
2nd stage hour counter (230V - 0.1A max.)
MV
Fan motor
PA
Air pressure switch
PG
Min. gas pressure switch
RS
Remote reset connection
SB
Remote lock-out signal (230V - 0.5 A max.)
SM
Air damper servomotor
SO
Ionisation probe
TB
Burner earth
TL
Limit thermostat
TR
2nd stage thermostat
TS
Safety thermostat
T6A
Fuse
V1
1st stage valve
V2
2nd stage valve
VS
Safety valve
XP4
4 pin/plug socket
XP6
6 pin plug/socket
XP7
7 pin/plug socket
WARNING
Do not invert the neutral with the phase in the
electrical supply line.
Check that the electrical supply of the burner
corresponds to that shown on the identifica-
tion label and in this manual.
The section of the conductors must be at
least 1mm
2
. (Unless requested otherwise by
local standards and legislation).
Connect the 2nd stage thermostat (TR) to the
terminals T6 - T8 removing the jumper.
WARNING
Check the burner stops by opening the thermo-
stats and check it locks out by opening the con-
nector (CN1)(Fig. 18) inserted in the probe's red
wire, located on the outside of the control box.
CAUTION
If the cover is still on, remove it and proceed with
the electric wiring following the wiring diagrams.
Use flexible cables in compliance with EN 60 335-
1 standards.
RS
E
TB
TB
1
P
2
P
PG
VS
V1
3
2
1
N
Ph
MV
C
M
SO
TL
PE
CN1
B4
S3
T2
T1
N
L1
h1
TS
L
N
SB
T6A
21
3
42
1
1
2
3
4
1
2
3
2
1
1
2
3
1
2
R
N
N
N
L2
S1
S2
B
A
C
M
G
A
XP6
XP7
SM
M
h2
TR
B5 T6 T7 T8
XP4
P
1
2
PA
P
V2
AD
CON
T
ROL B
O
X
Main switch
Fig. 18
D7363
Содержание 40 FS5D
Страница 2: ...Translation of the original instructions...
Страница 41: ......
Страница 42: ......
Страница 43: ......