page 20 / 84 0MLMHTM30RUENUA
MASTER HP - UL 300 kVA with TCE Power connection Terminals
MASTER HP - UL 400 kVA and 500 kVA with TCE Power connection Terminals
Note: When cables entering from the top, respect the following order: connecting cables to the Input terminals
first and Battery terminals then, and in the same way, connecting cables to the Bypass terminals first and Output
terminals then. The label marked “N” present on the terminal identifies the neutral terminal.
Maintenance Bypass Switch optional.
The single input is a factory default configuration. Do not remove the bypass jumpers. The input phase
connections are made using bolts to the bus bar. Do not loosen the bolts that attach the bus bar.
Bond: The UPS is provided with a separate bus bar that connects the Neutral Output to the frame Ground for
delta input connection. This is required to meet NEC grounding code for separately derived neutrals. When a
Neutral is provided in a Wye configured input connection the bus bar must be removed.
Once installation has been completed inside the equipment, put the switch cover panel back and close the door.
Содержание MASTER HP-UL Series
Страница 2: ...page 2 84 0MLMHTM30RUENUA RPS SpA Viale Europa 7 37045 Legnago VR Italy www riello ups com ...
Страница 18: ...page 18 84 0MLMHTM30RUENUA MASTER HP UL top cable entry version Top view cable entry in the UPS from the top ...
Страница 39: ...page 39 84 0MLMHTM30RUENUA 5 11 Block diagram ...