background image

(See Figure 8). As needed, clean or
change the abrasive strip.

Figure 8 – Cleaning the O.D. of Stationary Pipe

5. Release the trigger switch and turn the

drill OFF. Allow the prep tool to come to a
complete stop before setting down.

Deburring and Cleaning with
the Pipe Rotating

1. Set up the 300 Power Drive per its in-

structions.

2. If equipped, place the cutter, reamer and

diehead in the up (away from the opera-
tor) position, and move the carriage to-
ward the chuck.

3. Insert the pipe to be prepared into the

power drive per the instructions and with
at least 5" (127 mm) extending from the
chuck or carriage (if equipped), firmly
gripping the pipe 

(see Figure 9). Do not

grip the pipe in the area to be cleaned,
this could damage the pipe surface and
cause leaks. Make sure there is enough
room to hold and operate the drill and
prep tool. Using a pipe reamer, file or
similar tool, remove any inside diameter
(ID) burr which could obstruct pipe flow.

Figure 9 –  Pipe in 300 Power Drive, Inspecting

for Prep Tool Adequate Clearance

4. Place the foot switch to allow operation

while standing in front of the chuck. Make
sure that both the power drive and drill
are set for forward rotation (FOR switch
position on power drive, drill set as for
drilling a hole). 

2. Remove any inside diameter (ID) burr

which could obstruct pipe flow. Use a
pipe reamer, file or similar tool. 

3. Firmly grip the drill in both hands. Place

the prep tool over the end of the pipe, with
the pipe end seated in the roller area of
the prep tool. 

See Figure 7A. Make sure

that the end of the prep tool sufficiently
clears the vise and any other obstacles.
Squeeze the trigger switch to start the
prep tool turning. Firmly press the prep
tool into the end of the pipe for approxi-
mately 5-10 seconds while the rotating
rollers deburr the pipe.

Figure 7A – Pipe OD Deburr Position

Figure 7B – Pipe OD Cleaning Position

4. While maintaining a firm grip of the drill,

pull the prep tool into the cleaning position
(Figure 7B). The end of the pipe should
be a gainst the steel stop washer and the
abrasive strip should touch the outside of
the pipe. Hold the drill parallel to the pipe,
apply sideways force, and move the prep
tool around the pipe in an orbiting motion
until the seal area is appropriately
cleaned. If the drill is not parallel to the
pipe, the cleaned area will not be square
to the end of the pipe. For fastest clean-
ing, the orbiting motion of the drill should
be in the opposite direction as the rotation
of the drill chuck rotation (i.e. for clockwise
forward rotation of drill chuck, orbit drill in
a counterclockwise direction). This typi-
cally takes approximately 15 seconds

4

MegaPress

®

Pipe Preparation Tool

Pipe

Roller

Pipe

Abrasive

Strip

Steel Stop Washer

Direction Of

Drill

Orbiting

Motion

Direction Of

Drill Chuck

Rotation

Содержание MegaPress

Страница 1: ...g this tool Failure to understand and follow the contents of this manual may result in electri cal shock fire and or serious personal injury MegaPress Operator s Manual 99 Washington Street Melrose MA...

Страница 2: ...ry or death DANGER indicates a hazardous situation which if not avoided will result in death or serious injury WARNING indicates a hazardous situation which if not avoided could result in death or ser...

Страница 3: ...ve equipment Al ways wear eye protection Protective equip ment such as dust mask respirator non skid safety shoes hard hat or hearing pro tection used for appropriate conditions will help reduce the r...

Страница 4: ...G Before each use inspect and maintain your pipe prep tool and correct any pro blems to reduce the risk of serious injury prep tool damage and improper press connections 1 If mounted in a drill make s...

Страница 5: ...e drill is set to the drilling mode op erating position If the drill has multiple speed settings set to the highest speed range between 1 200 and 4 000 rpm Do not use the prep tool at higher speeds th...

Страница 6: ...truct pipe flow Use a pipe reamer file or similar tool 3 Firmly grip the drill in both hands Place the prep tool over the end of the pipe with the pipe end seated in the roller area of the prep tool S...

Страница 7: ...e pipe clean ing In general in the cleaned area there should be no loose pipe coating and the 5 Firmly grip the drill in both hands 6 Carefully place the prep tool over the end of the pipe Depress the...

Страница 8: ...smooth from prepara tion it may be acceptable to use Do not apply any coatings to fill depressions see Figure 14 4 If any issues are found either repeat the deburr and cleaning process or discard the...

Страница 9: ...N S I D E R I T S O L V E D Printed in U S 4 13 2013 RIDGID Inc 085 002 880 10 EC38830 02 REV B 99 Washington Street Melrose MA 02176 Phone 781 665 1400 Toll Free 1 800 517 8431 Visit us at www TestE...

Отзывы: