No.
Step
Section to see for this
5
Software configuration
Create a configuration with CX
Assistant.
Check the configuration.
Upload the configuration to the IPC.
"Software configuration" on
page 38.
6
Check the settings (of the Ridder CX500
controls) in Synopta.
"Software settings" on
page 44.
7
Calibrate the EC and pH sensors.
"Calibrating the sensors" on
page 45.
8
Pressurize the FertiMiX.
"Pressurizing the FertiMiX" on
page 45.
9
Using the dosing channels for the first time
Test the dosing channels by irrigating
briefly using the fertigation recipe.
Place the suction hoses in the correct
fertilizer/acid tank.
Make sure that the fluid levels in all
dosing channels are the same and
operating at the capacity specified.
"Using the dosing channels
for the first time" on page 46.
10
Test the FertiMiX by irrigating for a short
time.
"Testing the FertiMiX" on
page 47.
Use the Appendix: "Checklist for step-by-step installation procedure" on
page 60 to check that all installation steps have been completed.
4.3
Connecting water supply (hydronic installation)
Complete the following steps to connect the FertiMiX to the water supply:
1. Remove the dummy pipes from the inlet and outlet of the FertiMiX. These are
only included for transportation purposes.
2. Connect the FertiMiX to the water inlet and outlet pipes.
3. Connect the supply hoses provided for the fertilizers (and acid) to the dosing
channels.
The FertiMiX Pro C is built using metric units of measurement; adaptors for
imperial units are also delivered as standard.
4.4
Connecting electrical components
The electrical components include all the components that must be connected to
provide the FertiMiX and connected equipment/accessories with electricity and digital
information. This includes: the power cable, network cables, pipes and switches.
FertiMiX
33