2
English
Deutsch
Component Checklist
IMPORTANT:
Ensure that you have received all parts according to the component checklist prior to installation.
If any parts are missing or faulty, telephone your local distributor for a replacement.
C (x1)
B (x1)
A (x1)
D (x1)
E (x1)
J (x5)
K (x1)
F (x3)
G (x3)
H (x3)
3mm (x1)
L
6mm (x1)
M
I (x1)
N (x1)
Please note:
Rubber pad "O" can be glued at the factory on the table clamp "B".
O (x1)
Содержание TS0511
Страница 6: ...5 Schritt 2 Schritt 3 L L English Deutsch ...
Страница 7: ...6 Schritt 4 English Deutsch Schritt 5 2 1 5 E D G H F L G H F 27 N I L ...
Страница 11: ...10 Schritt 7 Schritt 8 90 35 English Deutsch M ...
Страница 18: ...5 English Deutsch Step 2 Step 3 L L ...
Страница 19: ...6 English Deutsch Step 4 Step 5 2 1 5 E D G H F L G H F 27 N I L ...
Страница 20: ...7 English Deutsch Step 6 a Tension Adjustment Step 1 Locknut removing Remove the lock nut using a screwdriver ...
Страница 23: ...10 English Deutsch Step 7 Step 8 90 35 M ...