11. Attach the guides of the output tray , , to the rear of the folder unit.
12. Attach the guide mylar to the middle output tray guide.
Power On
The folder unit must be switched on before the main machine.
1. Switch on the folder unit.
2. Switch on the main machine.
• The folder unit must be switched on first, so that the main machine will recognize the folder unit after
the main machine is powered on and starts its initialization procedure.
1. Installation
80
1
Содержание Neptune-P1
Страница 1: ...Neptune P1 Machine Code G180 SERVICE MANUAL June 2007 Subject to change...
Страница 13: ...Folder D889 452 Manual Feeder D333 453 Paper Cassette B853 454 Main Machine Configuration 455 12...
Страница 103: ...1 Installation 102 1...
Страница 111: ...Fusing Gears 1 Fusing Gears Barrieta S552R Apply to the surface of the rim 2 Preventive Maintenance 110 2...
Страница 114: ...Rear Cover 1 Rear cover x 2 A 2 Controller cover B x 1 Paper Exit Unit Common Procedures 113 3...
Страница 142: ...RF Exit Sensor 1 Open the drawer of the roll feeder 2 Plate A x 2 3 RF exit sensor B x 1 x 1 Paper Feed 141 3...
Страница 170: ...5 Remove the PSU A x1 x10 x all Controller Board 1 Remove A Rear cover x2 B Controller cover x1 Boards 169 3...
Страница 177: ...3 Remove the SFDB A x 2 x 2 standoffs x 2 3 Replacement and Adjustment 176 3...
Страница 180: ...4 Remove the cooling fan D x3 x1 Others 179 3...
Страница 402: ...Toner End Recovery Flow Chart Development 401 6...
Страница 449: ...6 Details 448 6...
Страница 457: ...MEMO 456...