Slide 31
Burn-in Test
After repairing each unit, a burn-in test is necessary.
In a burn-in test, the lamp is turned on for a set period of
time (such as 50 minutes), then off for another set period of
time (such as 10 minutes).
This can be accessed in the service mode.
For the procedure, see ‘System Maintenance – Functional
Tests
– Burn-in Test’ in the service manual.
The lamp on and off durations can be set before starting the
test.
This procedure takes a number of hours to complete, so
should not be done at the customer site.
After a normal repair: 2 hours
If the cause of the malfunction cannot be detected: 4 hours
After solving a problem that causes the power to
automatically turn off: 6 hours
Содержание KW5708
Страница 1: ...Slide 1 Y0AS Y0AT Y0AV Y0AY Y0AZ Y0B0 Y0BC Service Training Mizar PJ2 Version 1 0...
Страница 10: ...Slide 10 10 Overview External View...
Страница 11: ...Slide 11 11 Overview Connection Ports...
Страница 12: ...Slide 12 Operation Panel...
Страница 17: ...Slide 17 Service Training Basic Points about Service...
Страница 22: ...Slide 22 LED Display...
Страница 24: ...Slide 24 Replacing the Lamp To replace the lamp unplug the power cord and then wait for 60 minutes...
Страница 27: ...Slide 27 Replacing the Color Wheel Avoid touching the glass parts of the color wheel...
Страница 29: ...Slide 29 Rod Adjustment Adjust if there are yellowish or bluish parts in the image...
Страница 32: ...Slide 32 Service Training Updating Firmware...
Страница 35: ...Slide 35 Background Information Types of Projectors...
Страница 42: ...Slide 42 Background Information Polarization...
Страница 47: ...Slide 47 Background Information Terms and Definitions...
Страница 59: ...Slide 59 Throw Ratio Throw Ratio PD SW...
Страница 61: ...Slide 61...