4.0

Load Cell Wiring

Before the weigh module wiring can be completed, all load cell cable have to be routed through the conduit before beginning at 

the load cell outlet. Use the following steps to route the load cell cables through conduit to the junction box.  

1. Before routing load cell cables, mark each load cell cable at the end to help identify each load cell.
2. Working from the junction box corner (either pocket 2 or 4), insert a fish tape or similar tool and pull each load cell 

cable through the rigid conduit until all access cable is taken in.

Figure 4-1. Load Cell Pocket Numbering

3. Wire each load cell to the junction box terminal strip in accordance with the wiring code contained in the Certificate of 

Conformance (CC).

Load cell pockets are numbered to clarify wiring of load cells to the junction box (

Table 4-1 on page 8

).

4. The cable should not be routed near heat sources greater than 400

°

F (204

°

C). Do not shorten any load cell cable. The 

load cell is temperature compensated with the supplied length of cable. Cutting the cable will affect temperature 

compensation. Coil and protect excess cable so it will not be mechanically damaged or sit in water. 

5. Provide a drip loop in all cables so that water or other liquids will not run directly down the cables onto either the load 

cells or the junction box. 

Figure 4-2. Load Cell Wiring Drip Loop

1

2

3

4

Note

Содержание RoughDeck CS

Страница 1: ...RoughDeck CS Rail Car Coil Scale Installation Manual April 16 2021 PN 206036 Rev A...

Страница 2: ...marks of their respective companies All information contained within this publication is to the best of our knowledge complete and accurate at the time of publication Rice Lake Weighing Systems reserv...

Страница 3: ...d asking for the training department 1 0 Introduction 1 1 1 Safety 1 1 2 Scale Components 2 2 0 Installation 3 2 1 Recommended Equipment and Tools 3 2 2 Lifting and Handling 3 2 3 Temporary Setting Bl...

Страница 4: ...k CS Rail Car Coil Scale ii Visit our website www RiceLake com Rice Lake continually offers web based video training on a growing selection of product related topics at no cost Visit www ricelake com...

Страница 5: ...en guards are removed Indicates a potentially hazardous situation that if not avoided could result in minor or moderate injury Indicates information about procedures that if not observed could result...

Страница 6: ...ake com 1 2 Scale Components The RoughDeck CS Rail Car Coil Scale has major components including Assembled weighbridge module Weighbridge fasteners Load cells Load cell mounts with leveling bolts and...

Страница 7: ...each corner of the scale Torque wrench to 100 ft lb Socket wrenches to 1 1 2 drive compatible with torque wrench Box end wrenches to 1 1 4 Open end wrench set 7 16 and 1 1 4 4 bubble level Small torp...

Страница 8: ...connecting of the deck module Use leveling bolts in the base plate to level the scale Setting blocks are only used in the corners of the module where the load cell mounts are installed When placing m...

Страница 9: ...ount blocks ground straps and anchor bolts 3 1 Baseplate and Load Cell Installation Use the following steps for installing the mount baseplate and load cell in the load cell mount pockets 1 Remove the...

Страница 10: ...g or misalignment 12 Use an individual hammer drill to drill a 3 4 hole into the concrete at least 6 deep on one side of the mount frame 13 Drill a second anchor bolt hole on the opposite side of the...

Страница 11: ...n Figure 4 1 Load Cell Pocket Numbering 3 Wire each load cell to the junction box terminal strip in accordance with the wiring code contained in the Certificate of Conformance CC Load cell pockets are...

Страница 12: ...e guide shown in Table 4 1 and the labels on the terminal strips of the junction box To verify the wiring scheme see the Certificate of Conformity CC shipped with each load cell 8 For performance use...

Страница 13: ...nections in the junction box Pull the load cell cable out of the conduit Attach a pull cord to the load cell cable at the junction box before pulling the cable through the conduit 4 Remove the two loa...

Страница 14: ...that restrict movement 4 If check rods are used loosen all connections to finger tightening only for testing 5 Check load cell cables for physical or water damage If after all these checks the proble...

Страница 15: ...ent available from RLWS Equipment Return Department Examination of such equipment by RLWS confirms that the nonconformity actually exists and was not caused by accident misuse neglect alteration impro...

Страница 16: ...RoughDeck CS Rail Car Coil Scale 12 Visit our website www RiceLake com...

Страница 17: ......

Страница 18: ...nada Mexico 800 321 6703 International 715 234 9171 Europe 31 0 26 472 1319 Rice Lake Weighing Systems is an ISO 9001 registered company Rice Lake Weighing Systems Specifications subject to change wit...

Отзывы: